Continuous Row Layouts
Installation Instructions
Vault w/ visor
C-Scroll w/ visor
Roundel w/ visor
These installation instructions are valid with the above Ametrix styles
Warning
: Before starting any work ensure
that all sources of power are turned off. All
work must meet local/national codes and be
performed by a certified electrician.
Do not
mount fixtures vertically.
Small, OUTDOOR
CYI
(C
ontinuous
, Y
oke mount
, I
ntegral ballast
)
Visor and Non-Visor
Sheet 5 of 5
ADY071451 REV A(ECN070306)
Nominal
Row
Length
(ft)
Actual
Overall
Row
Length:
Outdoor
(ft)
Row Breakdown/
Installation Sequence
Nominal
Row
Length
(ft)
Actual
Overall
Row
Length:
Outdoor
(ft)
Row Breakdown/ Installation
Sequence
3
2.6
2C
27
25.4
3C,4C,4C,4C,4C,3C
4
3.6
3C
28
27.4
4C,4C,4C,4C,4C,4C
5
4.6
4C
29
28.9
4C,4C,3C,3C,3C,4C,4C
6
5.1
2C,2C
30
29.9
3C,4C,4C,4C,4C,4C,3C
7
6.1
2C,3C
31
30.9
4C,4C,4C,3C,4C,4C,4C
8
7.1
3C,3C
32
31.9
4C,4C,4C,4C,4C,4C,4C
9
8.1
3C,4C
33
31.9
4C,4C,4C,4C,4C,4C,4C
10
9.1
4C,4C
34
32.5
2C,4C,4C,4C,4C,4C,4C,2C
11
10.7
3C,3C,3C
35
34.5
3C,4C,4C,4C,4C,4C,4C,3C
12
11.7
4C,2C,4C
36
35.5
4C,4C,4C,4C,3C,4C,4C,4C
13
12.7
4C,3C,4C
37
36.5
4C,4C,4C,4C,4C,4C,4C,4C
14
13.7
4C,4C,4C
38
38.0
4C,4C,4C,3C,3C,3C,4C,4C,4C
15
14.2
3C,3C,3C,3C
39
39.0
3C,4C,4C,4C,4C,4C,4C,4C,3C
16
15.2
3C,3C,3C,4C
40
39.0
3C,4C,4C,4C,4C,4C,4C,4C,3C
17
16.2
3C,4C,4C,3C
41
40.0
4C,4C,4C,4C,3C,4C,4C,4C,4C
18
17.2
4C,4C,4C,3C
42
41.0
4C,4C,4C,4C,4C,4C,4C,4C,4C
19
18.2
4C,4C,4C,4C
43
42.6
4C,4C,4C,4C,3C,3C,3C,4C,4C,4C
20
19.8
4C,3C,3C,3C,4C
44
43.6
3C,4C,4C,4C,4C,4C,4C,4C,4C,3C
21
20.8
3C,4C,4C,4C,3C
45
44.6
4C,4C,4C,4C,4C,3C,4C,4C,4C
22
21.8
4C,4C,3C,4C,4C
46
45.6
4C,4C,4C,4C,4C,4C,4C,4C,4C,4C
23
21.8
4C,4C,3C,4C,4C
47
46.1
3C,3C,4C,4C,4C,4C,4C,4C,4C,3C,3C
24
23.4
2C,4C,4C,4C,4C,2C
48
47.1
4C,4C,4C,4C,3C,3C,3C,4C,4C,4C,4C
25
23.4
2C,4C,4C,4C,4C,2C
49
48.1
3C,4C,4C,4C,4C,4C,4C,4C,4C,4C,3C
26
25.4
3C,4C,4C,4C,4C,3C
50
49.1
4C,4C,4C,4C,4C,3C,4C,4C,4C,4C,4C