background image

M100 FireGard

TM

 Chain & Crank 

02/11 

IMPORTANT MECHANICAL INSTALLATION PROCEDURE 

 

WARNING

 - 

To reduce the risk of severe injury or death:

 

 
1.

 

READ AND FOLLOW ALL INSTALLATION INSTRUCTIONS. 

 
2.

 

Spring tension must be adjusted to allow the fire door to self close during a drop test, alarm 
activation and/or power failure. A door that is operating improperly could cause severe injury. Have 
qualified door system technicians make repairs to spring assemblies and other hardware before 
installing the operator. 
 

3.

 

Cover any exposed, moving operator parts that are less than 8 feet above the floor. 

 
4.

 

Do not connect the door operator to the source of power until instructed to do so. 

 
5.

 

When utilized, locate the “close” control station: (a) within sight of the door, (b) at a minimum 
height of 5 feet so small children cannot reach it, and (c) away from all moving parts of the door. 

 
6.

 

Instruct the end user on operation of the operator / release device. 

 
7.

 

The door is under extreme spring tension. Have qualified door system technicians make all 
necessary adjustments and repairs to the door. 

 
8.

 

Make sure the available alarm power supply to be connected to the operator is of the same voltage, 
frequency, phase and wattage as indicated on the nameplate of the alarm box. 

 
9.

 

Read and understand the wiring diagram of the alarm box (if applicable), and any other equipment to 
be connected to the operator. 

 
10.

 

Always disconnect power whenever installing or servicing the door or operator. 

 

 
 
 

 
 
 
 
 
 
 
 
 

Summary of Contents for FCA

Page 1: ...OKSON M100 FIREGARDTM ECO 1515 REVISION 0001 M100 FIREGARDTM CRANK OPERATORS BY RICKM DATE 2 9 2011 02 11 AUTO RESET MANUAL OPERATOR M100 FireGardTM Chain Model FCA M100 FireGardTM Crank Model FKA INS...

Page 2: ...to all appendices and amendments and the requirements of the local Authority Having Jurisdiction AHJ 3 Installation to be performed by factory authorized door system technicians only 4 Clear fire doo...

Page 3: ...ion see below Common Not Supervised Brake Release Dry Contact Rating 24VAC VDC 2A Max Resistive Load Common Not Supervised Fuse F1 3A 250V Slo Blo Type F2 1A 250V Fast Act Type z 24V input power can b...

Page 4: ...source of power until instructed to do so 5 When utilized locate the close control station a within sight of the door b at a minimum height of 5 feet so small children cannot reach it and c away from...

Page 5: ...TM Chain Crank 02 11 INSTALLATION INSTRUCTIONS INSTALLATION POSITIONS FOR FCA FKA RH LH Installation Illustration for FCA RH LH Installation Illustration for FKA Consult factory for changes in install...

Page 6: ...ardware to the mounting plate 4 Tighten the operator mounting plate to the door 5 When the operator is mounted on the bracket be sure the door sprocket is properly aligned in the same plane with the o...

Page 7: ...ADJUSTING THE DRIVE CHAIN NOTE Use correct type size and proper length of roller chain 1 Adjust the drive chain by moving the mounting screws so that there is about 1 4 of slack when the chain is dep...

Page 8: ...n door height the chain may need to be shortened or lengthened A DIFFERENT COLOR connecting link can be found in the hand chain Use this link for breaking the chain to make adjustments to the hand cha...

Page 9: ...ns subject to Canadian standards shall be performed in accordance with the Canadian Electrical Code Part I with respect to wiring material wiring gauge related to power capacity requirements and circu...

Page 10: ...en connecting more than one wire connector to the terminal must use enclosed Part CDA FH600 WHF02 See page 13 for illustration 2 Terminal 6 7 This connection provides 24VDC 1A power with 18AWG wire fo...

Page 11: ...nect 115VAC Connect 24VDC or 24VAC Voltage supplied by FACP or an UL listed power supply Connect FACP Alarm Dry Contact High Voltage Alarm Signal Connect Alarm Signal 115VAC Do Not Connect Jump Wire s...

Page 12: ...nicians only Fuse Link Thru wall conduit Ceiling FCA Fuse Link Eyebolt Fuse Link Eyebolt Eyebolt Eyebolt Eyebolt Figure 1 3 Optional fuselink arrangement hardware sash chain or cable eyebolts fuselink...

Page 13: ...12 M100 FireGardTM Chain Crank 02 11 WIRING DIAGRAM ILLUSTRATION...

Page 14: ...13 M100 FireGardTM Chain Crank 02 11 L1 L2 1 2 3 4 5 6 7 8 9 Must use when having two connections P N CDA FH600 WHF02...

Page 15: ...14 M100 FireGardTM Chain Crank 02 11 SCHEMATIC ILLUSTRATION g g g g g g g...

Page 16: ...RIPTION EVERY 3 MONTHS EVERY 6 MONTHS EVERY 12 MONTHS Fasteners Check tighten as required Drop test Inspect door drop test for proper operation and full closure per NFPA 80 Inspect and service wheneve...

Reviews: