COOK FCE Series Installation, Operation And Maintenance Manual Download Page 3

3

FCE/FCRU IO&M

B51150-003

Wiring Diagrams

Single Speed, Single Phase Motor

T-1
T-4

Ground B

L 2

L1

Ground A

Line

When ground is required, attach to ground A or B with No. 6 thread 

forming screw. To reverse, interchange T-1 and T-4.

2 Speed, 2 Winding, Single Phase Motor

Ground A

Ground B

T-1

T-4

Low Speed

High Speed

L1

L2

Line

When ground is required, attach to ground A or B with No. 6 thread 

forming screw. To reverse, interchange T-1 and T-4 leads.

Single Speed, Single Phase, Dual Voltage

Ground B

J-10

T-5

Ground A

Link A
Link B

Low Voltage

Line

L 2

L 1

Ground A

Link A & B

L1

L2

Line

Ground B

T-5

J-10

When ground is required, attach to ground A or B with No. 6 thread 

forming screw. To reverse, interchange T-5 and J-10 leads.

Typical Damper Motor Schematic

Fan

Motor

Damper

Motor*

Second

Damper

Motor

Transformer**

Transformer**

L3

L2

L1

For 3 Phase, damper motor voltage should be the same between L

1

 and 

L

2

. For single phase application, disregard L

3

.

*Damper motors may be available in 115, 230 and 460 volt models. The 

damper motor nameplate voltage should be verified prior to connection.

**A transformer may be provided in some installations to correct the 

damper motor voltage to the specified voltage.

3 Phase, 9 Lead Motor

4 5 6

1

7

2

8

3

9

L1 L2 L3

4 5 6

7 8 9

1 2 3

L1 L2 L3

Low Voltage

208/230 Volts

High Voltage

460 Volts

3 Phase, 9 Lead Motor

Y-Connection

7

1

6

7 8 9

4 5 6

1 2 3

Low Voltage

208/230 Volts

High Voltage

460 Volts

8

2

4

9

3

5

L1

L3

L2

L1

L3

L2

3 Phase, 9 Lead Motor

Delta-Connection

To reverse, interchange any 2 line leads.

2 Speed, 1 Winding, 3 Phase Motor

Motor

1
2

3

4
5

6

Together

High Speed

Line

L1

L 2
L 3

1
2

3

4
5

6

Open

Low Speed

Line

L1

L 2
L 3

Motor

To reverse, interchange any 2 line leads. Motors require magnetic 

control.

2 Speed, 2 Winding, 3 Phase

L

1

T

1

T

2

T

3

Low Speed
Low Speed
Low Speed

High Speed
High Speed
High Speed

Motor

T

13

T

12

T

11

L

2

Line

L

3

To reverse: High Speed-interchange leads T

11

 and T

12

. Low Speed-in-

terchange leads T

1

 and T

2

. Both Speeds-interchange any 2 line leads.

Operation

Pre-Start Checks

1.  Lock out all the primary and secondary power sources.

2.  Inspect and tighten fasteners and setscrews, partic-

ularly fan mounting and bearing fasteners. Refer to

 

Torque Chart

.

3.  Inspect belt tension and pulley alignment. Refer to 

Belt 

and Pulley Installation

, page 5.

4.  Inspect motor wiring. Refer to 

Wiring Installation

.

5.  Ensure belt touches only the pulleys.

6.  Rotate the wheel to ensure it rotates freely.

7.  Ensure fan and ductwork are clean and free of debris.

8.  Close and secure all access doors.

9.  Restore power to fan.

Start-Up

Turn on the fan. In variable speed units, set the fan to its 

lowest speed. Inspect for the following:

•  Direction of rotation

•  Excessive vibration

•  Unusual noise

•  Bearing noise

•  Improper belt alignment or tension (listen for squealing)

•  Improper motor amperage or voltage

If a problem is discovered, immediately shut the 

fan off. Lock out all electrical power and check for 

the cause of the trouble. Refer to 

Troubleshooting

 

on page 7.

Summary of Contents for FCE Series

Page 1: ...tile capable of causing serious injury or death When air is allowed to move through a non powered fan the impeller can rotate which is referred to as windmill ing Windmilling will cause hazardous cond...

Page 2: ...ative compound Wrap bearings for weather protection Cover the inlet and outlet to prevent the accumulation of dirt and mois ture in the housing Periodically rotate the wheel and operate dampers if sup...

Page 3: ...8 230 Volts High Voltage 460 Volts 8 2 4 9 3 5 L1 L3 L2 L1 L3 L2 3 Phase 9 Lead Motor Delta Connection To reverse interchange any 2 line leads 2 Speed 1 Winding 3 Phase Motor Motor 1 2 3 4 5 6 Togethe...

Page 4: ...vron SRI The above intervals should be reduced to half for verti cal shaft installations Inspection Inspection of the fan should be conducted at the first 30 minute 8 hour and 24 hour intervals of sat...

Page 5: ...rest authorized electric motor service representative Changing Shaft Speed All belt driven ventilators 5HP or less are equipped with variable pitch pulleys To change fan speed perform the following 1...

Page 6: ...s with cast frames can be ex tremely heavy and should not be lifted without addi tional aid Set motor aside 4 Locate the 4 to 8 bolts on the flat surface of the interior of the housing Begin to loosen...

Page 7: ...anced wheel Belts too loose worn or oily belts Speed too high Incorrect direction of rotation Make sure the fan rotates in same direction as the arrows on the motor or belt drive assembly Bearings nee...

Page 8: ...ing to the specific model and serial numbers of your fan Upon receipt by Loren Cook Company of your written complaint you will be notified within thirty 30 days of our receipt of your complaint in wri...

Reviews: