Contura C 790K Installation Instructions Manual Download Page 7

!

C 790K

103

GB

478

200**

700

1100

261

50**

Fire-retardant wall of
brick or concrete

900

900

311

593

50**

636

Fire-retardant wall of
brick or concrete

100

361

643

100

707

Combustible wall

407

211

A 1270*

139

B 1180*

C 574

72

Ø150

Air inlet Ø67

D 588

556

1593

2300*

126*

Combustible roof

INSTALLATION DISTANCES

*     If the stove is placed on a hearth plate made of glass for example (accessory), the height from the floor is affected by a distance corresponding to the thickness of the hearth plate. Also applies to 

separate glass hearth plates (accessory).

**  To prevent discolouration of painted non-flammable walls we recommend that the same side distance as to combustible walls is used.

The minimum distance in front of 
the stove opening to combustible 
parts of the building or interior 
decoration must be at least 1 m.

The dimension diagrams only 
show the minimum permitted 
installation distances for the 
stove. When connecting to a steel 
flue, also note the safety distance 
requirements of the flue. The 
safety distance between an un-
insulated flue and a combustible 
part of the building should be at 
least 300 mm.

Installation distances 

A =  

 height from floor to 
chimney connection 
upwards

B =  

 height from floor to c/c 
chimney connection rear

C = 

 height from floor to air inlet

D = 

 height from floor to lower 
edge of hatch

A separate glass hearth 
plate (accessory) 
increases the connection 
height to the chimney by 
10 mm.

678

400

479

479

311

100

Combustible wall

Permitted area 

for combustible 

parts of the 

building

Summary of Contents for C 790K

Page 1: ...www contura eu C 790K Installation instructions...

Page 2: ...ECLARED PERFORMANCE Essential characteristics Performance Harmonised technical specification Reaction to fire A1 WT Minimum distance to combustible material 100 mm to rear 400 mm to side Other safety...

Page 3: ...as this will affect the routines for regular chimney sweeping services List of Contents Technical details 100 Prior to installation 100 Connection to chimney 101 Supply of combustion air Option 102 I...

Page 4: ...suitable fitters Building application These main instructions may give guidance which would contravene national building regulations Please refer to supplementary instructions or ask your local autho...

Page 5: ...of the connection sleeve is 150 mm The stove requires a draft in the chimney of at least 12 Pa The draft is affected both by the length and area of the chimney and by how well sealed it is The minimum...

Page 6: ...and a correspondingly larger wall vent must be selected In hot areas the duct should be insulated with 30 mm mineral wool covered with a moisture inhibitor plastic It is important that the lead in be...

Page 7: ...combustible walls is used The minimum distance in front of the stove opening to combustible parts of the building or interior decoration must be at least 1 m The dimension diagrams only show the minim...

Page 8: ...A DIUM No 7 CH RO ME x 5 x 5 10 10 VANADIUM No 7 CHROME 1 3 2 10 10 VANA DIUM No 7 CHROME 104 GB ASSEMBLY Installing heat tank stone If the stove cannot be equipped with the heat tank stone advance to...

Page 9: ...4 6 5 105 GB ASSEMBLY...

Page 10: ...8 7 9 90 10 2 3 4 1 2 1 106 GB ASSEMBLY...

Page 11: ...107 GB ASSEMBLY...

Page 12: ...2 1 10 10 VANA DIUM No 7 CHROME 108 GB ASSEMBLY Installing suspension profiles...

Page 13: ...3 4 109 GB ASSEMBLY...

Page 14: ...6 5 10 10 VAN ADI UM No 7 CH RO M E 2 1 90 110 GB ASSEMBLY...

Page 15: ...7 8 111 GB ASSEMBLY...

Page 16: ...2 3 mm 1 2 3 4 3 mm 112 GB ASSEMBLY Installing tiles...

Page 17: ...5 7 6 113 GB ASSEMBLY...

Page 18: ...8 9 114 GB ASSEMBLY...

Page 19: ...1 2 3 4 115 GB ASSEMBLY Installing heat tank stone on top...

Page 20: ...nal inspection of the installation It is extremely important that the installation is inspected by an authorised chimney sweep before the stove is used Also read the Lighting instructions before light...

Page 21: ...ks Handle the vermiculite with care Lift the smoke baffle with one hand whilst removing the sides The side posts need not be removed when sweeping Reinstall in reverse order REMOVAL Removing the loose...

Page 22: ...1 2 3 118 GB ASSEMBLY Installing the base door...

Page 23: ......

Page 24: ...tura reserves the right to change dimensions and procedures described in these instructions at any time without special notice The current edition can be downloaded from www contura eu NIBE AB Box 134...

Reviews: