background image

Figure 5. Installed Bus Power Supply and Bracket

Bus Ethernet Gateway

B Ferrite 

Clamp

Bus Power Supply

D Mounting 

Bracket

Installing the Ferrite Clamp

Pick up the ferrite clamp and open it (you may need to use a small 

screwdriver to open it). 

Place the power cable in the clamp, and then thread the cable through the 

clamp, around the clamp, and back through the clamp again (see Figure 6).

Close the clamp until it snaps shut.

Figure 6. Ferrite Clamp Installation

Wiring Diagram

Figure 7. Bus Power Supply Wiring Diagram

Troubleshooting

Symptom

Possible Solution

Power supply does not 
power on.

Make sure the module is connected securely to the 
Mains power supply.

Additional Information

To view a video about how to install the Bus Power Supply, Bus Ethernet Gateway 

and wired keypads, refer to 

*!(%6! ŏ%#$0%*#Čŏ.0ŏąčŏ%.%*#ŏ1/ŏ!2%!/ŏĒŏ

!5, /

 on the Control4 University or Panelized Lighting products page at www.

control4.com.

For complete bus wiring scenarios, see the 

!5, ŏ1/ŏ%.%*#ŏ1% !

 at www.

control4.com.

Regulatory/Safety Compliance 

To review regulatory information for your particular Control4 products, see 

the information located on the Control4 website at: http://www.control4.com/

regulatory/.

Warranty 

For complete warranty information, including details on consumer legal rights as 

well as warranty exclusions, review the Warranty card or visit www.control4.com/

warranty.

About this Document

 

Part Number: 200-00362, Rev. A  8/01/2013  BN

A

C

C

C

C

C

D

B

Bus Ethernet Gateway

To Keypads Max 40

Keypads

Max 1000ft

GND

D

_

D+

V+

GND

D

_

D+

V+

Bus Power Supply

L

N

E

0V

0V

48V

48V

To Terminal Block

E

N

L

Reviews: