13
2.4.12 Service group
Example:
Programmation of the number of cycles when the machine will display:
After this message the service has to be carried out by a technician. Then reset the machine in menu
"SERVICE".
The servicing has to be carried out after 12000 cycles – see chapter MAINTENANCE.
2.4.13 Electrical Heating management
Three-phase connection: The heating elements can be supplied simultaneously.
Single-phase connection: the power supply has to be limited to 24, 19 or 14Ampers
The display will show:
Press + or – to change.
Power 1:
Consumption maxi: 14 A (230 V single-phase)
16 A Plug
Power 2:
Consumption maxi: 19 A (230 V single-phase)
20 A Plug
Power 3:
Consumption maxi: 24 A (230 V single-phase)
32 A Plug
Power 4:
TOTAL POWER (three-phase wiring only)
2.4.14 Double click activation
The double click activates a 2
nd
function for each push-button.
Double click:
The delivered product is identical.
The measurements are different (to be programmed).
Usually used pour the same produits delivered double.
2.4.15 Boiler filling
To program the Steam boiler filling with or without pump.
(in the case of the freestanding version, that requires the pump for the filling)
without pump: Filling with water inlet solenoid valve;
with pump:
Filling with water inlet solenoid valve and pump.
2.4.16 Drying time of the coffee grounds
After delivery of the coffee, a pause generally programmed at 3 seconds will allow to eliminte the
remaining pressure to avoid splashing of coffee grounds and dry the coffee grounds.
Power
1
Service group
8995
cycles
SERVICE GROUP