
PHASE 3
FRAME ASSEMBLY - cont.
STEP 1: Gather parts and hardware shown in table 3.
NOTE: An adult helper is required to stand
phase 2 frame assemblies upright
and hold in place until phase 3 is
complete.
STEP 4: Attach floor caps 'G' to fort uprights 'A'&'B'
with 05/16" x 3" lag screws and
05/16" flat washers.
*** Floor caps 'G' are 3/4" higher than
floor joist 'I'. (See Detail-1)
NOTE:
Make sure frame is level and square
before attaching floor caps 'G'.
8!5/16" x 3" LAG SCREWS -,-:,
85/16" FLAT WASHERS -'
TABLE 3 - PARTS AND HARDWARE
It> LE'TTER DESCRIPTION
C
FORT GROUND BEAM
H
SANDBOX BOAR!)
G
FLOOR CAPS
8!5/16" x 3" LAG SCREWS
85/16" FLAT WASHERS
STEP 2: Attach fort ground beam 'C' to fort
uprights 'A' with 05/16" x 3" lag screws
and 05/16" flat washers.
QTY
2
14
14
STEP 3: Attach sandbox board 'H' to fort uprights 'B'
with 05/16" x 3" lag screws and
05/16" flat washers.
8!5/16" x 3" LAG SCREWS
/� 85/16" FLAT WASHERS
/
DETAIL - 1
85/16" x 3" LAG SCREW
-✓-�
8!5/16" FLAT WASHERS
G
*Sandbox Upgrade - I
f
y
ou ordered the sandbox
k
it
attach additional E's and H's abo
v
e the ground le
v
el
using 5/16" x 3" lag screws and 5/16" washers pro
v
ided.
*
Summary of Contents for MONKEY PLAYSYSTEM FORT
Page 1: ...PACKACif 1 5HOWN MONKC Y PlAY5Y5ffM fORI A55 MB Y IN5fRUCflON5...
Page 2: ......
Page 4: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 25: ......
Page 26: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......