background image

SAVE THESE INSTRUCTIONS

DEALER/INSTALLER: GIVE TO HOMEOWNER

CONFER ABOVE GROUND 

CURVE STEP / ABOVE GROUND

CURVE STEP SYSTEM

ASSEMBLY AND INSTALLATION MANUAL

Made in the U.S.A. by

www.conferladders.com

Model CCX-AG

Note:  40 lbs. of sand required!

Model CCX-AG System

Note:  70 lbs. of sand required!

SAND

prpd.Confer-CurveStepAG-USr11:Confer-Step-1_R1  2/19/13  2:55 PM  Page 1

Summary of Contents for CCX-AG

Page 1: ... TO HOMEOWNER CONFER ABOVE GROUND CURVE STEP ABOVE GROUND CURVE STEP SYSTEM ASSEMBLY AND INSTALLATION MANUAL Made in the U S A by www conferladders com Model CCX AG Note 40 lbs of sand required Model CCX AG System Note 70 lbs of sand required SAND ...

Page 2: ...40 lbs of sand to complete assembly The Curve Step with optional add on requires a total of 70 lbs of sand Choose a location close to the swimming pool for assembly If you have a pool deck it is recommended to build the step on top of the deck to avoid lifting completed step over the pool wall Hardware Pack 4 Plugs wg 8 10 x 1 1 4 screws 2 Labels No Jumping Diving Needed for Assembly Rubber mallet...

Page 3: ...nly Upper fill hole must remain open Repeat procedure to fill the second part A Step 10 Installing the Foot Pads H If swimming pool has a flat bottom all four foot pads H will be installed with the 1 facing up If swimming pool has a slight taper towards the center the back foot pads will be installed with 1 facing up and the front foot pads with 2 facing up Step 7 The two back foot pads H will alw...

Page 4: ...F Step 15 Step 16 Step 17 With the step in place and positioned about 1 inch away from the inside of pool wall back of step must not touch pool liner extend the two deck connectors onto the pool deck and attach using 2 10 x 1 1 4 self tapping screws in each connector These screws should be spaced as far apart as possible using the holes provided in the deck connector Next attach the two deck conne...

Page 5: ...oot pad H on to the bottom of the tread support N by placing over the raised tab and striking with a rubber mallet until seated Foot pad H should be installed in the same position as the front foot pads on base step Step 23 Locate the notch on the bottom edge of the large flex riser M Slide the step support N under then rotate up making sure part is in notch Step 24 5 T S L K J R Q P M H N O U Add...

Page 6: ...IONS Contʼd At this time add 30 lbs of sand through the two fill holes located on the add on panel Using a funnel fill the lower hole completely to the top with sand Shake the panel to help settle the sand Lower hole must be completely filled Pour whatʼs left from the 30 lbs into the upper hole Using the provided cap plug the lower fill hole only Upper fill hole must remain open Step 25 The next s...

Page 7: ...Step 38 The last Top tread installs different from the previous three To install the last tread I place over the four tabs located on panel extension D Using a rubber mallet strike the top of the tread directly over the tabs until seated Step 39 Install the two handrail posts E into side panel A by following steps 13 and 14 The other two handrail posts E will not be used save as spare parts or rec...

Page 8: ...nto the water is not an option the unit can be removed by both people standing on the deck and lifting and tilting the unit to drain some of the water from the steps After the unit is light enough carefully lift it from the pool CAUTION POOL STEP WILL BE HEAVY PLEASE HAVE ADDITIONAL HELP WHEN REMOVING FROM SWIMMING POOL DO NOT ATTEMPT TO REMOVE STEP BY YOURSELF The Confer Curve Step can be covered...

Reviews: