Fingers
IMPORTANT: Remove the wedges from the deck plat-
form protrusions and SAVE for step 5.
Slide the handrail/ legs together as shown. Apply
liquid soap or spray lubricant to aid assembly.
Twist and save.
Pliers may be
useful to aid in removal.
Step 3.
Place one handrail/leg assembly on a clean
flat surface and push the deck platform protrusions
in the opening.
Step 4.
Repeat the process with the second handrail/
leg assembly, pushing firmly onto the deck
protrusions to ensure a secure fit.
Step 8.
Step 5.
Insert the four wedges that were saved from
step 1, into the top of the openings as shown.
Insert wedges
Step 12.
Attach
Bottom
treads
Stand here
Stand here
Push down firmly.
Push down firmly.
3
2
Step 6.
Slide five upper treads into position so they
are resting on the double nubs of the legs (as
shown in the diagram). Secure the treads to
the legs using the #10 x 1-1/4” screws (two
per tread), through the pre-drilled holes.
Deck Platform
Handrail/Leg
Left Tread
Connector
Upper
Tread
Right Tread
Connector
Adjustable
Brace
(As shown
in Step #13)
Upper
Brace
Upper
Tread
Bottom
Tread
Lower Base
Large
Barrier
Small
Barrier
Tread connectors
Step 7a.
1/4” Nylon
Nut
1/4" Washer
1/4”-
20 x 3-1/4”
Bolt
Snap Small
and Large
Barrier
Sections into
slots on
Lower Base
as shown.
Separate Barrier sections at the top slightly and
position Upper Brace over Small Barrier Section.
Next, spread the “fingers” on the Upper Brace and
slide into position on the Large Barrier Section.
Step 9.
Hardware Pack
26 - #10 x 1-1/4" screw
2 - 1/4 - 20 x 3-1/4" Bolt
6 - 1/4" Washer
2 - 1/4" Nylon Nut
2 - 1/4 - 20 x 2-1/4" Bolt
2 - Hex Nut
4 - Push in Plug (white)
2 - Adjustable Braces
1 - Cable Lock Set
Tools Needed for Assembly
* - Hammer or mallet
* - Cordless Drill Motor
* - 1/8” & 9/32” Drill Bits
* - Phillips screwdriver bit
* - Pliers
* - 7/16” wrench or adjustable wrench
* - Dish liquid or spray lubricant
Barrier Parts List (if included)
(Included in Hardware Pack)
4 -
#10 x 1-1/4” screws
1 - Strip of 4 Foam Pads
1 - Large Barrier Section
1 - Small Barrier Section
1 - Upper Brace
1 - Lower Base
Model #7000X
“ELIMINATOR” A-FRAME LADDER
Adjustable to fit 48” to 54” Rigid-Framed Above Ground Pools
ASSEMBLY INSTRUCTIONS - PLEASE READ BEFORE ATTEMPTING ASSEMBLY
Parts List
4 - Handrail / Leg
2 - Bottom Treads
8 - Upper Treads
1 - Left Tread Connector
1 - Right Tread Connector
1 - Deck Platform with
4 wedges attached
If missing parts call - Toll free U.S. - 866-396-2968 or www.conferladders.com
Step 7b.
Step 10.
SWING UP INSTRUCTIONS
When not in use
ALWAYS
secure ladder by swinging
up outer treads and locking with cable lock provided.
To swing up the outer treads stand on the
bottom tread, grasp the underside of the
second lowest tread and swing it out
toward you. Swing them up until the tread
connectors drop into the preformed locks
on each leg and stay in the upright position.
To lower the treads lift them straight up to
clear the locks and carefully swing them
down toward you.
Locate
cable
lock
here
11.
Place the Base and Brace into position, centered,
on the bottom and fourth treads of the ladder.
Install the four (4) #10 x 1-1/4" screws (included in
hardware pack) on a slight angle, first in the
Upper brace, then in the Lower Base. Install the
self-adhering foam strips to the Large Barrier
Section as shown in diagram.
NOTE:
Ladder
MUST
be filled with water to prevent floating.
Winterizing: To winterize your ladder unfasten the ladder from the deck and pull the ladder from the
pool. Remove the two plugs and lay the ladder on its side to allow the majority of the water to drain out
of it. A small amount of water left in the ladder will not cause any damage. Replace the plugs into the fill
holes so that they do not get lost. The ladder may be left outside.
Large
Barrier
Small
Barrier
Foam
Pads
Screws
3
Fingers
IMPORTANT: Remove the wedges from the deck plat-
form protrusions and SAVE for step 5.
Slide the handrail/ legs together as shown. Apply
liquid soap or spray lubricant to aid assembly.
Twist and save.
Pliers may be
useful to aid in removal.
Step 3.
Place one handrail/leg assembly on a clean
flat surface and push the deck platform protrusions
in the opening.
Step 4.
Repeat the process with the second handrail/
leg assembly, pushing firmly onto the deck
protrusions to ensure a secure fit.
Step 8.
Step 5.
Insert the four wedges that were saved from
step 1, into the top of the openings as shown.
Insert wedges
Step 12.
Attach
Bottom
treads
Stand here
Stand here
Push down firmly.
Push down firmly.
3
2
Step 6.
Slide five upper treads into position so they
are resting on the double nubs of the legs (as
shown in the diagram). Secure the treads to
the legs using the #10 x 1-1/4” screws (two
per tread), through the pre-drilled holes.
Deck Platform
Handrail/Leg
Left Tread
Connector
Upper
Tread
Right Tread
Connector
Adjustable
Brace
(As shown
in Step #13)
Upper
Brace
Upper
Tread
Bottom
Tread
Lower Base
Large
Barrier
Small
Barrier
Tread connectors
Step 7a.
1/4” Nylon
Nut
1/4" Washer
1/4”-
20 x 3-1/4”
Bolt
Snap Small
and Large
Barrier
Sections into
slots on
Lower Base
as shown.
Separate Barrier sections at the top slightly and
position Upper Brace over Small Barrier Section.
Next, spread the “fingers” on the Upper Brace and
slide into position on the Large Barrier Section.
Step 9.
Hardware Pack
26 - #10 x 1-1/4" screw
2 - 1/4 - 20 x 3-1/4" Bolt
6 - 1/4" Washer
2 - 1/4" Nylon Nut
2 - 1/4 - 20 x 2-1/4" Bolt
2 - Hex Nut
4 - Push in Plug (white)
2 - Adjustable Braces
1 - Cable Lock Set
Tools Needed for Assembly
* - Hammer or mallet
* - Cordless Drill Motor
* - 1/8” & 9/32” Drill Bits
* - Phillips screwdriver bit
* - Pliers
* - 7/16” wrench or adjustable wrench
* - Dish liquid or spray lubricant
Barrier Parts List (if included)
(Included in Hardware Pack)
4 -
#10 x 1-1/4” screws
1 - Strip of 4 Foam Pads
1 - Large Barrier Section
1 - Small Barrier Section
1 - Upper Brace
1 - Lower Base
Model #7000X
“ELIMINATOR” A-FRAME LADDER
Adjustable to fit 48” to 54” Rigid-Framed Above Ground Pools
ASSEMBLY INSTRUCTIONS - PLEASE READ BEFORE ATTEMPTING ASSEMBLY
Parts List
4 - Handrail / Leg
2 - Bottom Treads
8 - Upper Treads
1 - Left Tread Connector
1 - Right Tread Connector
1 - Deck Platform with
4 wedges attached
If missing parts call - Toll free U.S. - 866-396-2968 or www.conferladders.com
Step 7b.
Step 10.
SWING UP INSTRUCTIONS
When not in use
ALWAYS
secure ladder by swinging
up outer treads and locking with cable lock provided.
To swing up the outer treads stand on the
bottom tread, grasp the underside of the
second lowest tread and swing it out
toward you. Swing them up until the tread
connectors drop into the preformed locks
on each leg and stay in the upright position.
To lower the treads lift them straight up to
clear the locks and carefully swing them
down toward you.
Locate
cable
lock
here
11.
Place the Base and Brace into position, centered,
on the bottom and fourth treads of the ladder.
Install the four (4) #10 x 1-1/4" screws (included in
hardware pack) on a slight angle, first in the
Upper brace, then in the Lower Base. Install the
self-adhering foam strips to the Large Barrier
Section as shown in diagram.
NOTE:
Ladder
MUST
be filled with water to prevent floating.
Winterizing: To winterize your ladder unfasten the ladder from the deck and pull the ladder from the
pool. Remove the two plugs and lay the ladder on its side to allow the majority of the water to drain out
of it. A small amount of water left in the ladder will not cause any damage. Replace the plugs into the fill
holes so that they do not get lost. The ladder may be left outside.
Large
Barrier
Small
Barrier
Foam
Pads
Screws
WARNING! Using a corded drill near pool
may result in electrocution.
Slide five upper treads into position so they
are resting on the double nubs of the legs
(as shown in the diagram). Using a cordless
drill, secure the treads to the legs using the
#10 x 1-1/4” screws (two per tread), through
the pre-drilled holes.
WARNING! Verify that your chosen location
is level, has a solid base, and will be in full
view of competent adult supervision when in
use. Ladder MUST be filled with water to
prevent floating.
Place the ladder in the pool and fill legs with water
through the openings with a hose. Then plug the
holes using the four push in plugs. Tilt it so the air is
released from all the submerged treads.
Foam
Pads
Screws
Step 11.
Step 9.
Large
Barrier
Snap Small
and Large
Barrier
Sections into
slots on
Lower Base
as shown.
Small
Barrier
Separate Barrier sections at the top slightly
and position Upper Brace over Small Barrier
Section. Next, spread the “fingers” on the Upper
Brace and slide into position on the Large
Barrier Section.
Fingers
Step 10.
Place the Base and Brace into position, centered,
on the bottom and fourth treads of the ladder.
Install the four (4) #10 x 1-1/4” screws (included in
hardware pack) on a slight angle, first in the
Upper brace, then in the Lower Base. Install the
self-adhering foam strips to the Large Barrier
Section as shown in diagram.
Fingers
IMPORTANT: Remove the wedges from the deck plat-
form protrusions and SAVE for step 5.
Slide the handrail/ legs together as shown. Apply
liquid soap or spray lubricant to aid assembly.
Twist and save.
Pliers may be
useful to aid in removal.
Step 3.
Place one handrail/leg assembly on a clean
flat surface and push the deck platform protrusions
in the opening.
Step 4.
Repeat the process with the second handrail/
leg assembly, pushing firmly onto the deck
protrusions to ensure a secure fit.
Step 8.
Step 5.
Insert the four wedges that were saved from
step 1, into the top of the openings as shown.
Insert wedges
Step 12.
Attach
Bottom
treads
Stand here
Stand here
Push down firmly.
Push down firmly.
3
2
Step 6.
Slide five upper treads into position so they
are resting on the double nubs of the legs (as
shown in the diagram). Secure the treads to
the legs using the #10 x 1-1/4” screws (two
per tread), through the pre-drilled holes.
Deck Platform
Handrail/Leg
Left Tread
Connector
Upper
Tread
Right Tread
Connector
Adjustable
Brace
(As shown
in Step #13)
Upper
Brace
Upper
Tread
Bottom
Tread
Lower Base
Large
Barrier
Small
Barrier
Tread connectors
Step 7a.
1/4” Nylon
Nut
1/4" Washer
1/4”-
20 x 3-1/4”
Bolt
Snap Small
and Large
Barrier
Sections into
slots on
Lower Base
as shown.
Separate Barrier sections at the top slightly and
position Upper Brace over Small Barrier Section.
Next, spread the “fingers” on the Upper Brace and
slide into position on the Large Barrier Section.
Step 9.
Hardware Pack
26 - #10 x 1-1/4" screw
2 - 1/4 - 20 x 3-1/4" Bolt
6 - 1/4" Washer
2 - 1/4" Nylon Nut
2 - 1/4 - 20 x 2-1/4" Bolt
2 - Hex Nut
4 - Push in Plug (white)
2 - Adjustable Braces
1 - Cable Lock Set
Tools Needed for Assembly
* - Hammer or mallet
* - Cordless Drill Motor
* - 1/8” & 9/32” Drill Bits
* - Phillips screwdriver bit
* - Pliers
* - 7/16” wrench or adjustable wrench
* - Dish liquid or spray lubricant
Barrier Parts List (if included)
(Included in Hardware Pack)
4 -
#10 x 1-1/4” screws
1 - Strip of 4 Foam Pads
1 - Large Barrier Section
1 - Small Barrier Section
1 - Upper Brace
1 - Lower Base
Model #7000X
“ELIMINATOR” A-FRAME LADDER
Adjustable to fit 48” to 54” Rigid-Framed Above Ground Pools
ASSEMBLY INSTRUCTIONS - PLEASE READ BEFORE ATTEMPTING ASSEMBLY
Parts List
4 - Handrail / Leg
2 - Bottom Treads
8 - Upper Treads
1 - Left Tread Connector
1 - Right Tread Connector
1 - Deck Platform with
4 wedges attached
If missing parts call - Toll free U.S. - 866-396-2968 or www.conferladders.com
Step 7b.
Step 10.
SWING UP INSTRUCTIONS
When not in use
ALWAYS
secure ladder by swinging
up outer treads and locking with cable lock provided.
To swing up the outer treads stand on the
bottom tread, grasp the underside of the
second lowest tread and swing it out
toward you. Swing them up until the tread
connectors drop into the preformed locks
on each leg and stay in the upright position.
To lower the treads lift them straight up to
clear the locks and carefully swing them
down toward you.
Locate
cable
lock
here
11.
Place the Base and Brace into position, centered,
on the bottom and fourth treads of the ladder.
Install the four (4) #10 x 1-1/4" screws (included in
hardware pack) on a slight angle, first in the
Upper brace, then in the Lower Base. Install the
self-adhering foam strips to the Large Barrier
Section as shown in diagram.
NOTE:
Ladder
MUST
be filled with water to prevent floating.
Winterizing: To winterize your ladder unfasten the ladder from the deck and pull the ladder from the
pool. Remove the two plugs and lay the ladder on its side to allow the majority of the water to drain out
of it. A small amount of water left in the ladder will not cause any damage. Replace the plugs into the fill
holes so that they do not get lost. The ladder may be left outside.
Large
Barrier
Small
Barrier
Foam
Pads
Screws
Attach the tread
connector to
the ends of
each tread
using #10 x
1-1/4” screws
(four per tread).
Note: the
holes in the
tread
connectors
will not line
up with the
Position the right and left
hand tread connectors
onto the ends of the
treads and fasten them
to the ladder legs with
the hardware as shown
in diagram 7a above.
Tighten the hardware
securely but do not over
tighten, to allow treads to
swing up easily.
holes in the ends of the treads.
Simply drive the screws into
the ends of the treads.
Step 1.
Step 2.
Step 7.
Slide the three remaining upper
treads into position on the ladder legs.
Stand on one of the upper
treads to snap the legs into
the bottom tread.