12          Heavy Duty C-Track Manual

Pre-Operation Inspection

1.  The festoon system is now installed. Prior to hookup and application of power, the carrier should be cycled manually, if possible.
2.  Check for proper mounting of end clamps.
3.  Check for obstructions of channel joints.
4.  Check cable for proper loop depth, freedom of travel, and stretch-out.
5.  On pendant systems, check for proper spacing of the pendant to the floor, and connect this cable in the junction box.
6.  The cable connections now can be made to the power unit and the source, using the appropriate cable strain relief bushing(s).

Operation Instructions

•  Do not exceed the voltage or amperage rating of the cable. Overheating, fire, damages to equipment or personal injury could result.
•  Operate the festoon system within the electrical and mechanical limits it was intended.

Maintenance Instructions

All trolleys are lubricated and sealed for life, therefore no re-greasing is required. However, customers should conduct periodic 
inspections of the system. Determine the inspection intervals based on duty cycles and environment. The following checks are 
recommended during inspection:

1.  Check all rollers for wear
2.  Check tightness of all hardware. (See torque specifications)
3.  Check cable clamps on all trolleys, making sure cables remain secure.
4.  Inspect cable for any cuts or cracks.
5.  Check channel for wear, and clear the running surface of any debris.

SECTION 4 - OPERATION

SECTION 5 - MAINTENANCE

Summary of Contents for Festoon Heavy Duty C-Track

Page 1: ...Festoon Manual Heavy Duty C Track Heavy Duty C Track Manual XA 966300 3...

Page 2: ...ing goods shall arise once Buyer returns such goods FOB point of original shipment by Seller at the risk and cost of Buyer Goods replaced by Seller shall become the property of Seller There is no guar...

Page 3: ...ger Installation 7 Track Joint Assemblies Installation 7 Anchor Clamp Installation 8 Girder Clamp Installation 8 End Clamp Installation 8 Cable Trolley Installation 9 Tow Trolley Control Box Trolley I...

Page 4: ...FETY Safety Information Responsibility All owner operator and maintenance personnel must read and understand all manuals associated with this product before installation operation or maintenance The m...

Page 5: ...rack Hanger Installation See Section 3 Cable Trolley Installation See Section 3 Cable Installation See Section 3 End Clamp See Section 3 End Stop Installation See Section 3 2 Endstops Needed per Contr...

Page 6: ...ed The loop depth is the distance from the top of the track to bottom of the cable loop Maximum cable stack height is 1 5 Maximum recommended cable height is 65 For round cable the maximum recommended...

Page 7: ...ired in storage area 1 Slip the appropriate number of hangers on each section of C Track 2 Bolt the section loosely in place joining the ends of the channels with splice joints as you progress See Fig...

Page 8: ...s are designed to hold the crossarm supports to the I beam Two girder clamps required per crossarm support 1 Orient square nut flush against inside bottom surface of C Track crossarm support See Figur...

Page 9: ...ontrol festoon system The Control Box Trolley consists of a mobile junction box or a quick disconnect connector to which a push button pendant may be wired 1 Place the Tow Trolley Control Box Trolley...

Page 10: ...better suited to handle this force Note the specified cable loop depth and allowance for hookup 4 Arrange the cable package with a width to height ratio of 3 or 4 to 1 Tall narrow cable stacks can be...

Page 11: ...align tow bar with the Tow Trolley See Figure 11 2 Pre Assembled Festoon System Installation Pre assembled festoon systems are typically built and shipped installed on a C Track Channel by Conductix W...

Page 12: ...the voltage or amperage rating of the cable Overheating fire damages to equipment or personal injury could result Operate the festoon system within the electrical and mechanical limits it was intende...

Page 13: ...Heavy Duty C Track Manual 13...

Page 14: ...ADA 18450 J A Bombardier Mirabel QC J7J 0H5 Customer Support Phone 1 800 667 2487 Phone 1 450 565 9900 Fax 1 450 851 8591 info ca conductix com M XICO Calle Trevi o 983 C Zona Centro Apodaca NL M xico...

Reviews: