8
IOM CLUSTER BAR MANUAL
964000.5.0
2.0 Installation
7/8” REF
1-1/8” REF
1” REF
1-5/32 REF
Hanger Clamp
3-5/32” REF
8” MIN
18” MAX
75’-
96’-0” Copper
141’-0” Steel
Legend
Hager Clamp
End Cover
Expansion
Anchor Clamp
Straight Run
Figure 11
Anchor Clamps
Figure 10
2.6 Expansion Section
2.6.1
Note:
Location of expansion sections is important! If no installation
drawings for location of expansion sections, install as shown in Figure 11
above. Mount expansion sections halfway between anchor points. See
installation drawing for placement.
Special Note:
Expansion sections will not operate on curves.
2.6.2 Maximum distance between expansions are as follows:
2.6.3 Attach expansion section in same manner as conductor bar. Set
gaps according to the following chart:
Copper
96 ft.
Galvanized Steel
141 ft.
Bar Temperature
Gap Setting (in.)
(Degrees F)
(Dim “X”. Between
ends of Conductors.)
110
3.25
100
3.36
90
3.47
80
3.58
70
3.68
60
3.80
50
3.91
40
4.02
30
4.13
Expansion Section
Figure 12
19/32”
3/16”
7/16”
3/16”
3/16”
View A-A
View B-B
View C-C
A
B
C
A
B
C
1-1/8”
REF
3/4”
Gap Setting-Dim “X”
1/2” REF
3”
9-1/2” REF
6’-0” Expansion Shown
Side View
1” REF
1” REF
Summary of Contents for Cluster Bar
Page 1: ...IOM CLUSTER BAR MANUAL 964000 5 0 1 Conductor Bar Manual Cluster Bar...
Page 12: ...12 IOM CLUSTER BAR MANUAL 964000 5 0 5 0 Typical Installations...
Page 13: ...13 IOM CLUSTER BAR MANUAL 964000 5 0 Notes...
Page 14: ...14 IOM CLUSTER BAR MANUAL 964000 5 0 Notes...