![Condari QASAIR CON Installation & User'S Instructions Download Page 22](http://html1.mh-extra.com/html/condari/qasair-con/qasair-con_installation-and-users-instructions_2651816022.webp)
INSTALLATION INSTRUCTIONS
• WCV
All the rangehoods are supplied as Top ducted and can be Side or Back ducted through separate ducting pieces.
Side ducting can be either Left or Right.
When being installed over a gas cooker with an open flame griller the filters must be 1200 mm above the cooking
surface. In these cases, it may be necessary to have remote switching as the switches on the rangehood may be
out of reach.
Please refer to Gas Installation Code AG 601 – 2002.
1. Unplug power cable ‘A’ and fan cables.
2. Remove screws ‘B’ and remove inner section of rangehood.
3.
Loosen screws ‘C’ & ‘D’ by turning anti-clockwise.
4.
Turn screw ‘F’ anti-clockwise to extend the spring bracket.
5.
Insert outer shell of rangehood into cutout and turn screw ‘E’ clockwise to align rangehood with cupboard base. Be
sure that the spring bracket has engaged with the cabinet panel before tightening ‘E’.
6.
Do not over tighten.
7. Tighten screw ‘C’ by turning clockwise to lock fixing bracket.
8. Refit inner section of rangehood with screws ‘B’.
9. Plug power cable ‘A’ into it’s socket and in in fan cables.
10. Fit off ductwork as required.
11. To remove rangehood repeat points 1 & 2 loosen screw ‘C’, turn screw ‘F’ clockwise.
Installation Instructions
WCV1000L-2 WCV1300L-3
WCV1600L-3 WCV1800L-3
Cutout Dimensions -
WCV1000L-2 985 x 568
WCV1300L-3 1285 x 568
WCV1600L-3 1585 x 568
WCV1800L-3 1785 x 568
A
B
C
D
E
1. Unplug power cable
A
and fan cables.
2. Remove screws
B
and remove inner section of rangehood.
3. Loosen screws
C
&
D
by turning anti-clockwise.
4. Insert outer shell of rangehood into cutout and turn screw
E
clockwise
to align rangehood with cupboard base.
5. Do not over tighten this screw.
6. Tighten screw
C
by turning clockwise to lock fixing bracket.
7. Refit inner section of rangehood with screws
B
.
8. Plug power cable
A
into it's socket and plug in fan cables.
9. Fit off duct work as required.
10. To remove rangehood repeat points
1 & 2,
loosen screw
C
, turn screw
F
clockwise.
F
Installation Instructions
WCV1000L-2 WCV1300L-3
WCV1600L-3 WCV1800L-3
Cutout Dimensions -
WCV1000L-2 985 x 568
WCV1300L-3 1285 x 568
WCV1600L-3 1585 x 568
WCV1800L-3 1785 x 568
A
B
C
D
E
1. Unplug power cable
A
and fan cables.
2. Remove screws
B
and remove inner section of rangehood.
3. Loosen screws
C
&
D
by turning anti-clockwise.
4. Insert outer shell of rangehood into cutout and turn screw
E
clockwise
to align rangehood with cupboard base.
5. Do not over tighten this screw.
6. Tighten screw
C
by turning clockwise to lock fixing bracket.
7. Refit inner section of rangehood with screws
B
.
8. Plug power cable
A
into it's socket and plug in fan cables.
9. Fit off duct work as required.
10. To remove rangehood repeat points
1 & 2,
loosen screw
C
, turn screw
F
clockwise.
F
Installation must be carried out by the procedure outlined.
Failure to do so may void the guarantee.
Electrical:
Wiring to the appliance must comply with State and local Regulations.
Connection to be carried out by a registered electrician.
MOUNTING POSITION
Flush Mount ( 1 : 4 )
Proud Mount ( 1 : 4 )
A
A
B
B
Cupboard
Front of Rangehood
FLUSH MOUNT
Cupboard
Front of Rangehood
PROUD MOUNT
12
12
Qasair Rangehoods Installation Instructions
22
Summary of Contents for QASAIR CON
Page 1: ...UNDERCUPBOARD INSTALLATION USER INSTRUCTIONS ...
Page 2: ...Qasair Rangehoods Installation Instructions 2 ...
Page 56: ...Qasair Rangehoods Installation Instructions 56 NOTES ...
Page 57: ...Qasair Rangehoods Installation Instructions 57 NOTES ...
Page 58: ...Qasair Rangehoods Installation Instructions 58 NOTES ...
Page 59: ...Qasair Rangehoods Installation Instructions 59 NOTES ...