27
2. Mark holes on the duct floor, then drill holes.
• Measure dimensions “LX” , “C” , “da” and “BX” (thickness of the collector supporting sheet).
• Mark holes according to the illustration below, then drill holes.
U2
DX
C
C
C
T
D
DX
BX
BX
T
LX
da
db
Esco 10
Esco 20
Esco 30
T
69 mm **
95 mm **
95 mm
**
DX
Distance between the first bore to
the outer wall of the duct
DX= LX-T-BX
C
Distance according measurement
db
Diameter of the bores
db= da+2 mm
**
imperatively observe the dimensions indicated
U2 max: <36 mm
Esco 10
Esco 20
Esco 30
D
41.0 mm
59.5 mm
88.0 mm
T
69 mm
95 mm
95 mm
Summary of Contents for Esco
Page 1: ...INSTALLATION INSTRUCTIONS Steam humidification system 1117775 EN 1310 Condair Esco L...
Page 2: ......
Page 14: ...14 5 Seal the bores inside the duct with silicone free sealant...
Page 24: ...24 5 Seal the bores inside the duct with silicone free sealant...
Page 40: ...40 5 Seal the bores inside the duct with silicone free sealant...
Page 50: ...Notes...
Page 51: ...Condair Ltd Printed in Switzerland Technical modifications reserved...