background image

Installing the Plastic Lumber 

 

 

Boards are approximately ½” 

apart from each other. 

5.b. Attach remaining boards as previously done. 

 

5.a. With the first two boards secured into place, lay out the remaining boards onto the 
support structure. Evenly space the boards as shown in the diagram shown below. Beginning at 
one end, it works best to secure each board in turn using one screw at each end of the board to 
secure it to the support structure, repeating this process until all of the boards are attached to 
the support structure.

 

Summary of Contents for PH30-10

Page 1: ...py of the receipt with wording such as missing xyz part etc Note some shipments will have more than one pallet so check both before noting missing 4 Similar to 3 above also note the condition of the p...

Page 2: ...ion PH30 10 Swing Set Quantity Description 1 Box Containing Swing Set Parts 1 PH Full Barrier 2 PH Exit Barrier 1 PH Entrance Barrier 2 PH Canopy Side Support 1 PH Deck Package package will be in 1 Bu...

Page 3: ...8 x 13 11 Top rail 1 2 3 8 x 13 11 Top rail 1 8 Upright Ladder Actual length 10 1 Triple end with Sleeve 1 Pirate Climber 2 4 PH Joist Ends 3 4 PH Floor Joist 1 PH Center Canopy Support 26 Pieces Tot...

Page 4: ...t Carriage Bolt Set Screw with Allen Wrench 14 Sheet Metal Screw Lag Screw 14 Truss Screw 2 Self Tapping Screw Carabineer Spring Clip Panel Clamp Plastic Plug CH Deck Plug Pictures are not to sale The...

Page 5: ...l and meets the space requirements for your equipment PH30 10 Ground space 20 x 19 Play space 24 x 30 2 Please refer to the top rail assembly sheet and assemble your top rail as instructed 3 Position...

Page 6: ...nto the holes 12 Slide 3rd leg sleeve onto the top rail that is sleeved into the outside of the 10 ladder 13 Measure 5 6 away from the 10 Upright Ladder to mark and dig the hole for the Third Leg see...

Page 7: ...Step 1 Slide the ends of the 10 6 Top Rail as far as it will go into the Sleeve of the Triple End Step 2 Insert and tighten 4 3 8 x 3 8 set screws into the Triple End Sleeve using Allen Wrench provid...

Page 8: ...Two piece Top Rail Assembly Make sure to line up the set screws so they make a straight line as show in the graphic above Step 1 Step 2 Step 3...

Page 9: ...PH30 10 Model Overall Required Play Space Dimensions 24 x 28 24 28 GROUND SPACE 20 X 19 MINIMUM RESIDENTAL PLAY SPACE 24 X 28...

Page 10: ...Rail Assembly 3 A frame Leg Assembly 12 Hole 28 x20 x24 approx 6 7 80 lb bags of concrete mix per hole Holes 18 x 12 approx 1 80 lb bags concrete mix per hole Holes 18 x 12 approx 1 80 lb bags concret...

Page 11: ...ide x 2 bolt through the two holes and secure with the 3 8 nyloc jam nut Insert 3 8 x 3 8 and 3 8 x set screw and tighten to help secure the 3rd leg in place 3rd Leg Sleeve Nyloc Nut 3rd Leg 3 Third L...

Page 12: ...ular swing set configuration This is the end that will bolt to the vertical ladder Determine which holes you will be using by identifying the configuration below that most closely resembles the config...

Page 13: ...he ground as shown below Mark the holes for the Club House Legs Dig the holes to the specifications below Hole size for Play House Legs is 18 wide by 16 deep With top rail in place place deck frame sq...

Page 14: ...d and join together using 3 8 x 3 8 set screws 1 Slide the end of the drilled legs into the triple end 2 Align the holes in the legs with the holes in the triple end and join together using a 3 8 x 2...

Page 15: ...the A Frame end and allow the ladder to fall into its hole You can allow the structure to stand but it will not be level at this time Situate the ladder and A frame legs as desired in the space Be cer...

Page 16: ...the way and dig the holes A Frame leg holes are to be dug at 18 in diameter by 12 deep Notice Most of the A frame leg hole needs to be dug towards the inside of the A frame leg 3 f When the holes are...

Page 17: ...rd should be flush with the edge of the square tubing Now that these two boards are secure lay each of the remaining boards up and onto the floor structure and space them out evenly and to your satisf...

Page 18: ...ave at least three people to assemble the Play House Legs to the floor Joists Insert all four legs Then insert and secure one set screw into each leg to hold them in place Note We suggest you use a st...

Page 19: ...cture as shown attaching platform to 8 vertical ladder You may need to adjust the depth of the individual holes to make the platform structure and the ladder level up to each other and to make the hol...

Page 20: ...you buy will indicate approximate curing times If you are in doubt it is better to wait longer allowing the concrete more time to cure The amount of concrete to be used in each hole may vary For exam...

Page 21: ...red into place lay out the remaining boards onto the support structure Evenly space the boards as shown in the diagram shown below Beginning at one end it works best to secure each board in turn using...

Page 22: ...gles as shown below Use two of the eight sets of panel clamps with the 3 8 x 2 carriage bolt and 3 8 hex nut that are provided at each corner 45 Degree angle Top View 6 b Secure the barriers to the pl...

Page 23: ...oth of the six foot barriers with panel clamps as shown below 7 b Insert the canopy ridge pole into the brackets previously attached to the barriers Note Barrier configuration shown here is generic an...

Page 24: ...iers or configuration you may have purchased Attach one canopy side first and secure with 3 8 x 3 8 set screws down from top of barrier Once secure pull other side tight and secure with set screws Be...

Page 25: ...tep 1 Position slide on deck in desired location Step 2 Attach slide to deck with two 14 x 1 Truss Screws Slide Installation Instructions Deck Mount 14 x 1 Truss Screws Plastic Slide Deck Flat Washers...

Page 26: ......

Page 27: ...gather on the ground 2 Mark the center of the trench by measuring along the ground 36 from the edge of the deck Dig trench 36 wide x 12 x 12 deep 3 The Climber should be staked stakes are not provide...

Page 28: ...Washer Bracket with welded bolt Push two 1 3 8 Plugs in the ends Plastic Pivot 3 8 Nyloc Nut Pivot Plug Assemble Steering Wheel as shown above Then attach Bracket to the Barrier with panel clamps and...

Page 29: ...ic ring to the Bracket with welded washer Place the Base of the Telescope under the lip of the plastic ring and attach the other half of the plastic ring Telescope Base Plastic Ring Halves Bracket wit...

Page 30: ...ards in this type of equipment when used improperly Children should be instructed as to proper caution to take in its use Equipment should NOT be used when it is wet or icy Equipment should only be us...

Page 31: ...rdware stores and at Component Playgrounds The brass bushings inside of the swing hanger are impregnated with lubricant and will not generally require any further lubrication However these should be p...

Page 32: ...ife expectancy of the vinyl canopy is 3 5 years 7 Swing Seats These should be inspected at least twice annually and should be replaced as necessary 8 Slides Slides should never be lifted at the bottom...

Page 33: ...le helmets when using playground equipment 4 Remove drawstrings from hoodie s and jackets Remove attached mittens and gloves These can become entangled with the equipment and present the risk of stran...

Page 34: ...not cover damage resulting from flood fire catastrophe or other acts of nature To the extent permitted by law Component Playgrounds shall not be liable for any direct indirect special incidental or c...

Page 35: ..._______ CUSTOMER INFORMATION Project Name _______________________________________ Contact Person _____________________________________ Address ___________________________________________ City ________...

Reviews: