Top Rail Assembly
Step 1
: Slide the Swing Hangers onto the Top Rail and tighten them in place.
(Refer to Top View Diagram on the previous page for spacing).
Step 2
: Slide the ends of the 10’ Top Rail as far as it will go into the
Sleeve of the Triple End.
Step 3:
Insert and tighten four ⅜” x ⅜” set screws into each of the Triple
End Sleeve using the Allen Wrench provided.
Summary of Contents for MT10-10
Page 4: ...Model MT10 10...
Page 5: ......