1.

Select an area in your yard that is reasonably level and meets the 
space requirements for your equipment. Ground Space: 9’ x 13’ Play 
Space: 13’ x 29’ 

2.

Using the measurements from the top view diagram, measure and 
mark the position of the Swing Hangers and Upright Ladders on both 
9’ Top Rails. Place the Horizontal Ladder on the ground in the 
desired location with Top Rails in the correct position on the ground. 
(Measure and adjust the Horizontal Ladder on the ground as 
necessary to provide for the proper play space.) 

3.

Move the 9’ Top Rails and set aside. 

4.

With the Horizontal Ladder in its proper position, mark the locations 
for the holes where the two Upright Ladders will stand. 

5.

Move the Horizontal Ladder and dig the holes (see hole sizes for 
cementing). 

6.

Lay each Upright Ladder on the ground near the hole where it will 
eventually stand. Make a mark 15” from the top of the Ladder onto 
each Ladder Rail. 

7.

Move the Adjustable Sleeves to these marks and position them to 
receive the Horizontal Ladder. This is accomplished by turning them 
to point at a 90 degree angle toward what will become the inside of 
the structure. (The rungs are welded to what will become the outside 
of the structure.) Secure set screws. 

8.

Repeat the process on the other Upright Ladder. Secure set screws. 

9.

Place the Upright Ladders onto their sides with the bottom of the pipe 
just over the hole where it will eventually stand. Attach the Horizontal 
Ladder to the Adjustable Sleeves of the Upright Ladders and secure 
the set screws (see Horizontal Ladder to Upright Ladder assembly). 
Hint: Do not push Horizontal Ladder tight against the Upright 
Ladders. Leave a ½” - 1” gap between the Upright Ladder Rails and 
the Horizontal Ladder. This will allow for easier adjustment of the 

Summary of Contents for HL50

Page 1: ...your vision It is important that you choose to protect your vision by wearing proper safety glasses during each and every phase of this construction process PLEASE READ AND UNDERSTAND ALL INSTRUCTION...

Page 2: ...ay each Upright Ladder on the ground near the hole where it will eventually stand Make a mark 15 from the top of the Ladder onto each Ladder Rail 7 Move the Adjustable Sleeves to these marks and posit...

Page 3: ...r to Top Rail assembly Secure set screws 13 Assemble and attach Swing Hangers to Top Rail see Swing Hanger assembly sheet 14 Attach swing chains seats trapeze bar and rings 15 Measure the height of th...

Page 4: ......

Page 5: ...les Place the 9 Top Rails and 12 6 Horizontal Ladder in the play space as shown below Mark where the ladder holes will need to be dug Remove the top rails and horizontal ladder Dig the ladder holes to...

Page 6: ...Dig each hole should be dug 28 long x 20 wide x 24 deep When digging be sure that the holes line up with the ladder and each other as shown below...

Page 7: ...tical ladders into the proper place Then slide the 9 top rails into the top sleeve of each upright Top rail should be placed at 43 5 from each end to top sleeve Once in place secure by inserting x set...

Page 8: ...e the third and fourth people push each upright ladder into the horizontal as shown below With only two people have one position themselves in the middle of the horizontal ladder while the other place...

Page 9: ...Now make whatever adjustments are needed to ensure that your set is level Tighten all set screws Once this is complete you are ready to mix and pour the concrete...

Page 10: ...each hole may vary For example If you are installing your play structure into a grassy area you may want to leave the concrete about three to four inches below the top of the hole This will allow you...

Page 11: ...2 Reassemble on to swing top rail Tighten securely so that the hanger is firmly attached in place and cannot slide or swivel along top rail 3 Attach carabineer with chain through the ring Note We rec...

Page 12: ...azards in this type of equipment when used improperly Children should be instructed as to proper caution to take in its use Equipment should NOT be used when it is wet or icy Equipment should only be...

Page 13: ...e items are coated with a high quality galvanizing However swing hangers may become discolored or may eventually rust Should this happen a touch up using a cold galvanizing compound followed by a coat...

Page 14: ...rs of use by happy children 6 Vinyl Canopies If you have purchased a structure which includes a vinyl canopy this product should be inspected occasionally for wear and will need to be replaced as nece...

Page 15: ...le helmets when using playground equipment 4 Remove drawstrings from hoodie s and jackets Remove attached mittens and gloves These can become entangled with the equipment and present the risk of stran...

Page 16: ...t cover damage resulting from flood fire catastrophe or other acts of nature To the extent permitted by law Component Playgrounds shall not be liable for any direct indirect special incidental or cons...

Page 17: ...ipt Invoice Number Model s For safety please inspect all moving parts on a regular basis At least yearly Especially paying attention to wear within the swing hanger Customer Information Name Address C...

Reviews: