Installation Instructions
Model CP-PS36-8
GROUND SPACE 33’ X 1’
RESIDENTIAL MINIMUM
PLAY SPACE 45’ X 32’
Upright Post Sleeve to Top Rail Assembly
3/8” x 3/8”
Set Screws
(4 per sleeve)
3/8” x 3/8”
Set Screws
(4 per sleeve)
30” 20” 26” 20” 30”
30” 20” 26” 20” 30”
8’
9’
36”
36”
36”
Dig holes 24” in diameter x
36” in depth. (Approx. 7
80lb bags of concrete in
each hole)
Dig holes 24” in diameter
x 36” in depth. (Approx. 7
80 lb bags of concrete in
each hole)
1.
Loosen and remove the top two nyloc jam nuts.
2.
Reassemble on to swing top rail with the carriage bolt on
top and the nyloc nut on the bottom (Or carriage on
bottom and nut on top if it won’t fit the other way.
Tighten securely so that the hanger is firmly attached in
pace and cannot slide or swivel along top rail.
3.
Attach chain through security clevis and tighten using
provided Clevis Key.
36”
30” 20” 26” 20” 30”
1’ Ground Cover
1’ Ground Cover
1’ Ground Cover