128”
Hole size is 24”
diameter by
36” deep.
Measure 2” from the end of
the top rail to find the center
of the post hole.
2”
2”
Marking your holes
1.
Loosen and remove the top two nyloc jam nuts.
2.
Reassemble on to swing top rail with the carriage
bolt on top and the nyloc nut on the bottom (Or
carriage on bottom and nut on top if it won’t fit
the other way. Tighten securely so that the hanger
is firmly attached in pace and cannot slide or
swivel along top rail.
3.
Attach chain through security clevis and tighten
using provided Clevis Key.