Compaq StorageWorks HSG60 Installation Card Download Page 6

Page 6

b. Follow on-screen instructions to connect the ECB.

See 

Figure 4

 for the location of the Cache A (

7

) and 

Cache B (

8

) modules. The relative locations of 

controllers and cache modules are similar for all 
enclosure types.

FRUTIL exits. The ECB expiration date and deep 
discharge history are updated.

IMPORTANT:  

Wait for FRUTIL to terminate.

c. Following single ECB replacement:

1) Remove the old ECB and place the ECB in an 

antistatic bag or on a grounded antistatic mat.

2) If the replacement ECB was not placed within an 

available bay, install the ECB into the vacant bay of 
the old ECB.

d. Following dual ECB replacement, if the other cache 

module is also to be connected to the new dual ECB, 
connect the PC or terminal to the “other controller” 
maintenance port.

The connected controller now becomes “this 
controller.”

e. Repeat 

step 4

 through 

step d

 as required.

f. Disconnect the PC terminal from the controller 

maintenance port.

HSZ80 Controller Configurations

Use the following steps and 

Figure 1

 through 

Figure 5

, a

appropriate, to replace an ECB in single-controller and 
dual-redundant controller configurations using FRUTIL:

1. Connect a PC or terminal to the maintenance port of the 

controller that has the defective ECB.

The controller connected to the PC or terminal becomes 
“this controller.”

2. Enter the following command to verify that system time is 

set:

SHOW THIS_CONTROLLER FULL

3. If system time is not set or current, enter current data using 

the following command:

SET THIS_CONTROLLER 
TIME=dd-mmm-yyyy:hh:mm:ss

IMPORTANT:  

An internal clock monitors the life of the ECB battery. This 

clock must be reset after replacing an ECB.

4. Start FRUTIL with the following command:

RUN FRUTIL

5. Enter Y(es) to confirm the intent to replace the “this 

controller” ECB.

CAUTION:  

Make sure that at least one ECB is connected to the 

ECB Y-cable at all times during this procedure. Otherwise, cache 
memory data is not protected and is subject to loss.
The ECB Y-cable has a 12-volt and a 5-volt pin. Improper handling 
or misalignment when connecting or disconnecting might cause 
these pins to contact ground, resulting in cache module damage.

NOTE:  

If an empty bay is not available, place the replacement ECB 

on top of the enclosure or at the bottom of the rack.

6. Insert the replacement ECB into an appropriate bay or near 

the ECB being removed.

7. Follow on-screen instructions to connect the ECB.

See 

Figure 4

 for the location of the Cache A (

7

) and Cache 

B (

8

) modules. The relative locations of controllers and 

cache modules are similar for all enclosure types.

FRUTIL exits. The ECB expiration date and deep discharge 
history are updated.

IMPORTANT:  

Wait for FRUTIL to terminate.

8. Following single ECB replacement:

a. Remove the old ECB and place the ECB in an antistatic 

bag or on a grounded antistatic mat.

b. If the replacement ECB was not placed within an 

available bay, install the ECB into the vacant bay of the 
old ECB.

9. Following dual ECB replacement, if the other cache 

module is also to be connected to the new dual ECB, 
connect the PC or terminal to the “other controller” 
maintenance port.

The connected controller now becomes “this controller.”

10. Repeat 

step 4

 through 

step 9

 as required.

11. Disconnect the PC terminal from the controller 

maintenance port.

Hot-Pluggable Procedure for StorageWorks 
Model 2100 and 2200 Enclosures

For HSG60, HSG80, and HSJ80 controller configurations with 
FRUTIL support, follow the applicable controller procedure 
previously addressed. For a hot-pluggable ECB replacement, 
use the procedure in this section.

IMPORTANT:  

The pluggable procedure (used in the HSG60, HSG80, HSJ80, 

and HSZ80 controller sections) uses FRUTIL to update the ECB battery 
expiration date and deep discharge history.
The hot-pluggable procedure in this section replaces the ECB only and 

does 

not

 update ECB battery history data.

Use the following procedure to replace an ECB as a 
hot-pluggable device:

1. Using 

Figure 4

, determine the specific bay to install the 

ECB.

NOTE:  

Make sure this bay supports the same cache module (A or B) as 

the ECB being removed.

2. Press the release tab and pivot the lever downward on the 

replacement ECB.

3. Remove the blank panel from the appropriate vacant bay (A 

or B).

4. Align and insert the replacement ECB into the vacant bay 

until the lever engages the enclosure (see 

Figure 5

).

5. Lift the lever upward until the lever locks.

Summary of Contents for StorageWorks HSG60

Page 1: ...tem For instructions on upgrading a single controller configuration to a dual redundant controller configuration refer to the appropriate array controller user guide or maintenance and service guide E...

Page 2: ...2100 and 2200 enclosure ECB Figure 4 ECB and cache module locations in a StorageWorks Model 2100 and 2200 enclosure IMPORTANT When replacing an ECB see Figure 5 match the vacant ECB bay with the supp...

Page 3: ...n a grounded antistatic mat HSZ70 Dual Redundant Controller Configurations Use the following steps and Figure 1 or Figure 2 to replace an ECB 1 Connect a PC or terminal to the maintenance port of the...

Page 4: ...te to replace an ECB in single controller and dual redundant controller configurations using FRUTIL 1 Connect a PC or terminal to the maintenance port of the controller that has the defective ECB The...

Page 5: ...if desired enter current data using the following command SET THIS_CONTROLLER TIME dd mmm yyyy hh mm ss IMPORTANT An internal clock monitors the life of the ECB battery This clock must be reset after...

Page 6: ...ins to contact ground resulting in cache module damage NOTE If an empty bay is not available place the replacement ECB on top of the enclosure or at the bottom of the rack 6 Insert the replacement ECB...

Page 7: ...de IMPORTANT Make sure to identify the existence of this updated table in the user guide Table 1 ECB Status LED Displays LED Display ECB State Definition Startup Checking temperature and voltage If th...

Reviews: