Compaq StorageWorks HSG60 Installation Card Download Page 5

Page 5

g. Repeat this entire procedure to replace the ECB for the 

“other controller.”

All other supported enclosures

CAUTION:  

Make sure that at least one ECB is connected to the 

ECB Y-cable at all times during this procedure. Otherwise, cache 
memory data is not protected and is subject to loss.
The ECB Y-cable has a 12-volt and a 5-volt pin. Improper handling 
or misalignment when connecting or disconnecting might cause 
these pins to contact ground, resulting in cache module damage.

a. Follow on-screen instructions concerning availability 

and replacement questions for the ECB.

NOTE:  

If an empty bay is not available, place the replacement ECB 

on top of the enclosure or at the bottom of the rack.

b. Insert the replacement ECB into an appropriate bay or 

near the ECB being removed.

c. Follow on-screen instructions to connect the ECB.

d. Disconnect the ECB Y-cable from the old ECB.

e. Press Enter/Return.

IMPORTANT:  

Wait for FRUTIL to terminate.

f. For single ECB replacement:

1) Remove the old ECB and place the ECB in an 

antistatic bag or on a grounded antistatic mat.

2) If the replacement ECB was not placed within an 

available bay, install the ECB into the vacant bay of 
the old ECB.

g. For dual ECB replacement, if the other cache module is 

also to be connected to the new dual ECB, connect the 
PC or terminal to the “other controller” maintenance 
port.

The connected controller now becomes “this 
controller.”

h. Repeat 

step d

 through 

step g

 as required.

i.

Disconnect the PC terminal from the controller 
maintenance port.

HSJ80 Controller Configurations

Use the following steps and 

Figure 1

 through 

Figure 5

, a

appropriate, to replace an ECB in single-controller and 
dual-redundant controller configurations using FRUTIL:

1. Connect a PC or terminal to the maintenance port of the 

controller that has the defective ECB.

The controller connected to the PC or terminal becomes 
“this controller.”

2. Enter the following command to verify that system time is 

set:

SHOW THIS_CONTROLLER FULL

3. If system time is not set or current, if desired, enter current 

data using the following command:

SET THIS_CONTROLLER 
TIME=dd-mmm-yyyy:hh:mm:ss

IMPORTANT:  

An internal clock monitors the life of the ECB battery. This 

clock must be reset after replacing an ECB.

4. Start FRUTIL with the following command:

RUN FRUTIL

5. Enter Y(es) to confirm the intent to replace the “this 

controller” ECB.

6. Continue this procedure as determined by the enclosure 

type:

StorageWorks Model 2100 and 2200 enclosures

All other supported enclosures

StorageWorks Model 2100 and 2200 enclosures

NOTE:  

Install a Battery Service Label on the replacement ECB prior to 

installing the ECB in the enclosure. This label indicates the installation 
date (MM/YY) for the replacement ECB.

a. Install a Battery Service Label on the replacement ECB 

as described by the Compaq StorageWorks ECB Battery 
Service Label Placement
 installation card.

b. Follow on-screen instructions to replace the ECB.

CAUTION:  

Make sure to install the replacement ECB in a bay that 

supports the same cache module as the current ECB being 
removed (see 

Figure 4

).

Remove the blank bezel from this replacement bay and reinstall 
the blank bezel in the bay vacated by the current ECB. Failure to 
reinstall the blank bezel might cause an over temperature 
condition and damage the enclosure.

Do not

 remove the old ECB until the ECB charged LED on the 

replacement ECB turns O

N

 (see 

Figure 3

1

).

The ECB expiration date and deep discharge history are 
updated.

FRUTIL exits.

c. Disconnect the PC terminal from the controller 

maintenance port.

d. Repeat this entire procedure to replace the ECB for the 

“other controller,” if necessary.

All other supported enclosures

CAUTION:  

Make sure that at least one ECB is connected to the 

ECB Y-cable at all times during this procedure. Otherwise, cache 
memory data is not protected and is subject to loss.
The ECB Y-cable has a 12-volt and a 5-volt pin. Improper handling 
or misalignment when connecting or disconnecting might cause 
these pins to contact ground, resulting in cache module damage.

NOTE:  

If an empty bay is not available, place the replacement ECB 

on top of the enclosure or at the bottom of the rack.

a. Insert the replacement ECB into an appropriate bay or 

near the ECB being removed.

Summary of Contents for StorageWorks HSG60

Page 1: ...tem For instructions on upgrading a single controller configuration to a dual redundant controller configuration refer to the appropriate array controller user guide or maintenance and service guide E...

Page 2: ...2100 and 2200 enclosure ECB Figure 4 ECB and cache module locations in a StorageWorks Model 2100 and 2200 enclosure IMPORTANT When replacing an ECB see Figure 5 match the vacant ECB bay with the supp...

Page 3: ...n a grounded antistatic mat HSZ70 Dual Redundant Controller Configurations Use the following steps and Figure 1 or Figure 2 to replace an ECB 1 Connect a PC or terminal to the maintenance port of the...

Page 4: ...te to replace an ECB in single controller and dual redundant controller configurations using FRUTIL 1 Connect a PC or terminal to the maintenance port of the controller that has the defective ECB The...

Page 5: ...if desired enter current data using the following command SET THIS_CONTROLLER TIME dd mmm yyyy hh mm ss IMPORTANT An internal clock monitors the life of the ECB battery This clock must be reset after...

Page 6: ...ins to contact ground resulting in cache module damage NOTE If an empty bay is not available place the replacement ECB on top of the enclosure or at the bottom of the rack 6 Insert the replacement ECB...

Page 7: ...de IMPORTANT Make sure to identify the existence of this updated table in the user guide Table 1 ECB Status LED Displays LED Display ECB State Definition Startup Checking temperature and voltage If th...

Reviews: