background image

 

2. 

Foo

tp

rin

ts

 

Components 

 

 

 

Suction Vent 

Custom VKP8III Receipt Printer 

Payment Express 

SCR200 Secure Card Reader 

Camlock 

Optional IP Phone Speaker 

Payment

 

Express

 

SKP200

 

PIN pad

 

Privacy Shield 

Optional IP Phone Mic 
and Button 

Vent 

Security PIN pad 

Optional 3G Router 

Net Switch 

MX Box 

UPS Board 

Dot Matrix Display 

COMFMS Board 

2 Pole 16A ISO 
Main Switch 

RS232 Ports 

Optional 4G Router 

Summary of Contents for OPT SCR200

Page 1: ...OPT SCR200 Installation Manual Version No 1 0 3 Model OPT Mark 2 SCR200 Date 7th December 2018...

Page 2: ...ac C4000 processor s performance Compac Industries Limited has no control over each installation s unique operating environment Hence Compac Industries Limited makes no representations or warranties c...

Page 3: ...t any time This publication describes the state of the product at the time of publication and may not reflect the product at all times in the past or in the future Manufactured By The Compac OPT SCR20...

Page 4: ...ion Date 06 03 2018 Authorised By W Zheng File Name OPT SCR200 Installation Manual Revision History Version Date Author s Revision Notes 1 0 0 06 Mar 2018 S Laycock New Manual 1 0 1 20 Mar 2018 S Layc...

Page 5: ...ts 2 Tools Checklist 3 Precautions 4 Mechanical Installation 5 Mounting the OPT on a Post 6 Electrical Installation 7 Cable Requirements 7 Electrical Testing 9 Tank Gauging Setup 11 System and Transac...

Page 6: ...1 Footprints Footprints Base Footprint External Dimensions...

Page 7: ...Secure Card Reader Camlock Optional IP Phone Speaker Payment Express SKP200 PIN pad Privacy Shield Optional IP Phone Mic and Button Vent Security PIN pad Optional 3G Router Net Switch MX Box UPS Board...

Page 8: ...iver 7mm nut driver 8mm nut driver T30 Torx drive bit or driver T10 Torx drive bit or driver Metric spanner set Metric 3 8 or 1 4 drive socket set 1 4 screwdriver bit holder 1 4 A F spanner 6 adjustab...

Page 9: ...nser The OPT should be placed at least 0 5 metres from any flammable liquid fuel dispensers and 1 5 metres from any LPG dispensers The OPT should be mounted so that the base of the cabinet is at least...

Page 10: ...lowing equipment Mechanical and electrical tools Multimeter Fastenings to mount the OPT Security key drivers Security TORX or unique security key if Extra Security equipped A fully charged laptop comp...

Page 11: ...OPTs do not have the bolt covers Fasten using the supplied galvanised bolts with the rounded head facing out and a flat washer under the nut To mount the OPT onto the post OPTs with the extra securit...

Page 12: ...ed depending on the brand of pump on site Correct polarity must be observed NOTE For pump comms tank gauging and ADSL connections it is suggested that the wires are crimped to a ferrule to provide a g...

Page 13: ...le at the bottom of the aerial for when the spring flexes A loop of 50mm before fixing the cable should be sufficient The aerial plugs into the wireless router Neatly cable tie the aerial cable to exi...

Page 14: ...turned on two LEDs above the power switch should turn on LED labelled D5 indicates the 230V mains power is OK D6 indicates the battery is connected and OK If D6 does not light up when then unit is fi...

Page 15: ...10 Electrical Testing UPS Board LEDs FMS Board LEDs Diagnostic LEDs...

Page 16: ...hecks to confirm this The exact site test setup and procedure will vary from customer to customer but as a minimum we would suggest the following Check that the current price is correct Check each dis...

Page 17: ...ounted appropriately Wireless internet OPTs Check that the pump comms have been connected Check that the tank gauging is connected and operating correctly where fitted Replace ATG cable to OPT where p...

Page 18: ...orrect Tank Information Tests where fitted Yes No Check that tanks are set up in CompacOnline and that correct information from the equipment is being displayed on screen Check that the correct fuels...

Reviews: