TC-96272-IP
© 2019 CommScope, Inc. .
Page 11 of 20
Panel stubs on Flex Frame EHD and CHD panels will already be broken out to the required
dimensions. Cables from non-Flex-Frame panels must be broken out to the dimensions provided
in
. Panel stubs and equivalent cables from non-Flex-Frame panels are not
secured within the cabinet. They simply enter through the side and the slack is dressed into the
slack management features.
Facility cables must be broken out to the dimensions provided in
. This may
be done for all cables at the same time, before loading splice trays, or it may be done for the
associated cable as each splice tray is loaded. Breakout kits are required for facility cables. The
RIBCBOUT kits described in TC-96271-IP (see
“Related Publications” on page 2
) are advised. RIB-
CBOUT kits include cable clamps. Cable clamps are also available for cables not being installed
with RIBCBOUT kits (see
Figure 10. Cable Routing in Splice Cabinet Top Splice Deck