TC-96302-IP
Page 21
© 2021
CommScope
. All Rights Reserved.
2. Route pigtails to the panel and terminate the pigtail connectors at the assigned adapter pack,
as shown in
. Cable slack shall be spooled inside the perimeter of chassis and
restrained with cable ties at tie-down points provided, as necessary.
3. Route the facility cable to the panel and secure it in a cable entry port using a gland connector
as shown in
.
4. Route the pigtails and facility cable within the EPX panel in the opposite direction and into the
opposite side of the Agile splice tray as shown in
Figure 20. Cable Routing to AGILE Splice Tray (G2 shown)
Note:
For more information on cable glands, refer to
Note:
On 2U and 4U shelves splice trays may be installed stacked on top of each other.
Ensure that suitable slack is provided to allow tray on sliding versions to fully extend