![CommScope COWO Installation Instructions Manual Download Page 6](http://html1.mh-extra.com/html/commscope/cowo/cowo_installation-instructions-manual_2643562006.webp)
6
B
Fiber management top cable entry
C
Fiber management rear cable entry
5.3
Push the cable (Ø 3 - 7 mm) down aligning the end of the
cable sheath with the cable stop. The fibers are guided from top entry
inside a channel from the right hand side to the left hand side. When
passing the hinge of the cassette these fibers need to be positioned
underneath the outgoing fibers of the cassette (if existent) and are routed
into the splice cassette. Close the splice cassette and loop the fibers
inside the splice cassette once splicing is done. Secure the cable using
the strain relief.
5.4
Observe the minimum bend radius for the cable when it is
outside the wall box. Excess length should wound up behind the box in
a loop. For cables Ø ≤ 3 mm strip the cable sheath to a length that the
cable sheath enters the fiber box till the first down holder. For cables Ø
> 3 mm strip the cable sheath to a length that it cannot enter the fiber
box. Feed the blank fibers or with their 0.9 mm coating into the box.
Using the channels provided, guide the fibers to the splice cassette,
passing the hinge of the cassette. After splicing, loop the fibers inside
the cassette. Secure the cable by using the strain relief.
Cable stop
Cable stop
for ø > 3mm
Cable stop
for ø ≤ 3mm