![CommScope 260103821 Installation Manual Download Page 27](http://html1.mh-extra.com/html/commscope/260103821/260103821_installation-manual_2643775027.webp)
Page 27 of 37
© 2021 CommScope, Inc. All Rights Reserved
8.2.6
Route fiber(s) to be spliced to top splicing tray. See photos 114-116.
Photo 114
Photo 115
Photo 116
8.2.7
Splice per standard practice.
8.2.8
Replace dust cover on tray after splicing.
8.3
Mid-sheath ribbon central core
8.3.1
Route ribbon to tray entry points and mark ribbon 1” beyond grommet locations.
8.3.2
De-ribbonize fiber between marks. See photos 117-118.