![CommScope 260103821 Installation Manual Download Page 20](http://html1.mh-extra.com/html/commscope/260103821/260103821_installation-manual_2643775020.webp)
Page 20 of 37
© 2021 CommScope, Inc. All Rights Reserved
Note: Straighten steel strength members back into original position.
Photo 72
Photo 73
Photo 74
If cable is shielded and to be grounded proceed to
Section 6,
Cable bonding and grounding.
Proceed to
Section 7
, Cable retention.
5.2.4.8
Snap cable retention assembly into the appropriate location.
5.2.4.9 Secure with bolts if grounded. See photos 75-77.
Photo 75
Photo 76
Photo 77
5.2.4.10 Remove ribbon containing fiber(s) to be spliced from fiber stack.
5.2.4.11
If ribbons are not to be spliced, route to storage area.
Tray stack may be removed for easier access to storage. See photos 78-81.
Photo 78
Photo 79
Photo 80
Photo 81
Proceed to
Section 8
Fiber organizing/storage, routing and splicing.