6
5
Preparing the fixture body for mounting
□
Attach the V-clip (DD) to the hanging holes on the fixture body (A).
□
Attach the hook on one end of the mounting chain (AA) to the
center of the V-clip (DD) and close the hook with pliers to secure it.
□
Repeat these steps with the second V-clip (DD) and mounting chain
(AA) on the opposite end of the fixture body (A).
nOTe:
The user can attach the S-hook (BB) to connect the mounting
chain (AA) and metal hook (not included) from the ceiling if needed.
suspension Mounting (continued)
6
Attaching the chain to the ceiling
□
Hang the fixture body by placing one mounting chain (AA) over each hook (not included) that has been installed on the ceiling.
□
Adjust the mounting chains (AA) to level the light. The fixture must hang at least 3 in. from the ceiling.
□
Feed the wiring through conduit based on local electrical code.
DD
Hanging holes
AA
Hook
A
AA
Hook on one end
of the chain