![Commercial Electric 1007155949 Use And Care Manual Download Page 5](http://html1.mh-extra.com/html/commercial-electric/1007155949/1007155949_use-and-care-manual_2643178005.webp)
5 HOMEDEPOT.COM
Please contact 1-877-527-0313 for further assistance.
Flush Mount Installation
34 in.
34 in.
0.1 in.
0.1 in.
ceiling
ceiling
ceiling
ceiling
LL
LL
LL
LL
JJ
JJ
1
a
Mounting two screws to a
drywall ceiling
1
b
Mounting two screws to a
wooden ceiling
□
Measure and mark the location. The spacing between
the mounting screws (LL) should be 34 in. Drill pilot holes
through the wood using a 7/64 in. bit and cordless drill. Drive
the shop light mounting screws (LL) into the pilot holes.
□
Measure and mark the location for the wall anchors (JJ).
The spacing between the wall anchors (JJ) should be 34 in.
Drill pilot holes through the drywall using a 3/16 in. bit and
cordless drill. Manually press the wall anchors (JJ) into the
pilot holes. Drive the shop light mounting screws (LL) into
the wall anchors (JJ).
□
Insert the mounting screw (LL) into the mounting hole located on the back of the solar shop light (AA). Repeat this step on the opposite side.
Slide the shop light to the left or right side to lock the shop light into place. The shop light should be firmly fixed against the shop light
mounting screws (LL).
2
Inserting the screws into the mounting holes
LL
LL
AA
ceiling
ceiling
NOTE:
Do not drive the screw flush onto
the ceiling. Leave a gap of 0.1 in. between
the ceiling and top of screw.
NOTE:
No anchors needed. Do not drive the
screw flush onto the ceiling. Leave a gap of
0.1 in. between the ceiling and top of screw.