B.
Remove End Cap & Filler Plate
1.
Remove (4) screws from baserail
2.
Partially slide push pad off approx. 2-3”
3.
Using 5/32” drill bit. Open up the (2) back screw holes #3 & 4.
4.
5.
Installation Instructions
Continue sliding push pad half way out of the base rail so activating bracket is accessible. Next, remove metal rod
and AB mount can be put aside.
Activ
ating Br
acket
Baserail
Metal Rod
AB Mount
U S C U S T O M E R S U P P O R T 1 - 8 8 8 - 6 2 2 - 2 3 7 7 | W W W . C O M M A N D A C C E S S . C O M | C A C U S T O M E R S U P P O R T 1 - 8 5 5 - 8 2 3 - 3 0 0 2