background image

507768-04P

Page 34 of 56

Issue 1933

Condensate Piping

This  unit  is  designed  for  either  right  or  left  side  exit  of 

condensate  piping  in  upflow  applications.  In  horizontal 

applications, the condensate trap must extend below the 

unit. An 8” service clearance is required for the condensate 

trap.  Refer  to  Figure  52  for  condensate  trap  locations. 

Figure  59  shows  trap  assembly  using  1/2”  PVC  or  3/4” 

PVC.

CONDENSATE TRAP AND PLUG LOCATIONS

(Unit shown in upflow position)

Plug

(same on 

left side)

Trap

(same on 

right side)

1-1/2 in.

NOTE 

- In upflow applications where side return air 

filter is installed on same side as the condensate 

trap, filter rack must be installed beyond condensate 

trap or trap must be relocated to avoid interference.

Figure 52. 

NOTE: 

If necessary the condensate trap may be installed 

up to 5’ away from the furnace. Use PVC pipe to connect 

trap  to  furnace  condensate  outlet.  Piping  from  furnace 

must slope down a minimum of 1/4” per ft. toward trap.

1.  Determine which side condensate piping will exit the 

unit, location of trap, field-provided fittings and length 

of PVC pipe required to reach available drain.

2.  Use  a  large  flat  head  screw  driver  or  a  1/2”  drive 

socket  extension  and  remove  plug  (Figure  52)  from 

the  cold  end  header  box  at  the  appropriate  location 

on the side of the unit. Install provided 3/4 NPT street 

elbow fitting into cold end header box. Use Teflon tape 

or appropriate pipe dope.

3.  Install the cap over the clean out opening at the base 

of the trap. Secure with clamp. See Figure 54.

4.  Install drain trap using appropriate PVC fittings, glue 

all  joints.  Glue  the  provided  drain  trap  as  shown  in 

Figure 59. Route the condensate line to an open drain. 

Condensate line must maintain a 1/4” downward slope 

from the furnace to the drain.

5.  Figure  55  and  Figure  56  show  the  furnace  and 

evaporator  coil  using  a  separate  drain.  If  necessary 

the condensate line from the furnace and evaporator 

coil can drain together. See Figure 57 and Figure 58.

Upflow  furnace  (Figure  53)  -  In  upflow  furnace 

applications the field provided vent must be a minimum 

1” to a maximum 2” length above the condensate drain 

outlet connection. Any length above 2” may result in a 

flooded heat exchanger if the combined primary drain 

line were to become restricted.

Horizontal furnace (Figure 55) - In horizontal furnace 

applications the field provided vent must be minimum 

4” to a maximum 5” length above the condensate drain 

outlet connection. Any length above 5” may result in a 

flooded heat exchanger if the combined primary drain 

line were to become restricted.

NOTE: 

In horizontal applications it is recommended to 

install a secondary drain pan underneath the unit and 

trap assembly.

NOTE: 

Vinyl tubing may be used for condensate drain. 

Tubing  must  be  1-1/4”  o.d.  X  1”  i.d.  and  should  be 

attached to the drain on the trap using a hose clamp.

Do not use copper tubing or existing copper condensate 

lines for drain line.

 CAUTION

6.  If unit will be started immediately upon completion of 

installation, prime trap per procedure outlined in Unit 

Start-Up section.

Condensate  line  must  slope  downward  away  from  the 

trap  to  drain.  If  drain  level  is  above  condensate  trap, 

condensate  pump  must  be  used.  Condensate  drain  line 

should  be  routed  within  the  conditioned  space  to  avoid 

freezing  of  condensate  and  blockage  of  drain  line.  If 

this is not possible, a heat cable kit may be used on the 

condensate trap and line. Heating cable kit is available in 

various lengths; 6 ft. (1.8 m) - kit no. 26K68; 24 ft. (7.3 m) - 

kit no. 26K69; and 50 ft. (15.2 m) - kit no. 26K70.

A separate drain line must be run to the drain from the 

condensate trap to ensure proper drainage and pressure 

switch operation. DO NOT connect the condensate trap 

drain into the drain line from the evaporator coil.

 CAUTION

Summary of Contents for GUH96C

Page 1: ...onal injury or loss of life Installation and service must be performed by a licensed professional installer or equivalent service agency or the gas supplier WARNING As with any mechanical equipment pe...

Page 2: ...ther side 23 3 4 603 25 635 3 3 8 86 D 1 NOTE C 5 5 Ton size units installed in upflow applications that require air volumes of 1800 cfm 850 L s or greater must have one of the following 1 Single side...

Page 3: ...507768 04P Page 3 of 56 Issue 1933 Figure 1 Parts Arrangement...

Page 4: ...diameter debris screen 1 3 4 Threaded street elbow NOTE The required bellows grommet is field provided See the Gas Piping section for relevant diagrams Check equipment for shipping damage If you find...

Page 5: ...peration of either the heating or the cooling unit unless it is in the full HEAT or COOL setting When installed this furnace must be electrically grounded according to local codes In addition in the U...

Page 6: ...on and unsafe operation When the furnace is installed in non direct vent applications do not block the furnace combustion air opening with clothing boxes doors etc Air is needed for proper combustion...

Page 7: ...ombustion and ventilation depend largely on whether the furnace is installed in an unconfined or a confined space Unconfined Space An unconfined space is an area such as a basement or large equipment...

Page 8: ...ey shall be of the same cross sectional area as the free area of the openings to which they connect The minimum dimension of rectangular air ducts shall be no less than 3 inches 75 mm In calculating f...

Page 9: ...lated Crawl Space and Outlet Air to Outside Shipping Bolt Removal Units with 1 2 hp 3 4 hp blower motor are equipped with three flexible legs and one rigid leg The rigid leg is equipped with a shippin...

Page 10: ...ystem The base must provide a stable support and an airtight seal to the furnace Allow absolutely no sagging cracks gaps etc For no reason should return and supply air duct systems ever be connected t...

Page 11: ...ngs are provided on both sides of the furnace cabinet for installations that require side return air Cut the furnace cabinet at the maximum dimensions shown on Page 2 Furnace applications which includ...

Page 12: ...ir Flow Right Hand Discharge Left End Right End Air Flow Air Flow Bottom Floor Left Hand Discharge Top Plenum 1 in 25 mm Front 0 Back 0 Sides 0 Vent 0 Floor 0 Front clearance in alcove installation mu...

Page 13: ...Filters This unit is not equipped with a filter or rack Afield provided filter is required for the unit to operate properly Table 1 lists recommended filter sizes A filter must be in place whenever th...

Page 14: ...either PVC or CPVC Low temperature solvent cement is recommended during cooler weather Metal or plastic strapping may be used for vent pipe hangers Uniformly apply a liberal coat of PVC primer for PVC...

Page 15: ...ic kit is provided with a 1 1 2 accelerator which must be installed on the exhaust outlet when this kit is used with the 45 000 and 70 000 furnaces When using 1 1 2 in piping the pipe must be transiti...

Page 16: ...ce connected to the venting system being placed into operation could result in carbon monoxide poisoning or death The following steps shall be followed for each appliance connected to the venting syst...

Page 17: ...ed to prevent leakage of combustion products into the living space CAUTION Vent Piping Guidelines This gas furnace can be installed as either a Non Direct Vent or a Direct Vent gas central furnace NOT...

Page 18: ...Capacity Min Vent Length 045 070 090 110 15 ft or 5 ft plus 2 elbows or 10 ft plus 1 elbow Any approved termination may be added to the minimum length listed 045 070 090 110 Standard or Concentric Se...

Page 19: ...78 78 9 36 21 70 55 23 92 92 73 73 10 31 16 65 50 18 87 87 68 68 Standard Termination at Elevation 4 501 10 000 ft Number of 90 Elbows Used 1 1 2 Pipe 2 Pipe 2 1 2 Pipe 3 Pipe Capacity Capacity Capac...

Page 20: ...81 74 74 9 28 13 60 45 19 76 76 69 69 10 23 8 55 40 14 71 71 64 64 Concentric Termination Elevation 4501 10 000 ft Number of 90 Elbows Used 1 1 2 Pipe 2 Pipe 2 1 2 Pipe 3 Pipe Capacity Capacity Capac...

Page 21: ...73 72 53 53 10 21 6 50 50 28 68 67 48 48 Standard Termination Elevation 4 501 10 000 ft Number of 90 Elbows Used 1 1 2 Pipe 2 Pipe 2 1 2 Pipe 3 Pipe Capacity Capacity Capacity Capacity 045 070 090 110...

Page 22: ...N 1 1 2 2 6 MINIMUM Figure 25 TYPICAL EXHAUST PIPE CONNECTIONS IN HORIZONTAL DIRECT OR NON DIRECT VENT APPLICATIONS RIGHT HAND DISCHARGE SHOWN SIDE VIEW 45 MAX 45 MAX 2 2 2 2 or 2 12 max EXHAUST TRANS...

Page 23: ...talled in either direct vent or non direct vent applications In non direct vent applications when intake air will be drawn into the furnace from the surrounding space the indoor air quality must be co...

Page 24: ...ng or a platform Ensure that the intake air inlet will not be obstructed by loose insulation or other items that may clog the debris screen 2 If intake air is drawn from a ventilated attic Figure 31 o...

Page 25: ...nation care must be taken to maintain protective coatings over building materials prolonged exposure to exhaust condensate can destroy protective coatings It is recommended that the exhaust outlet not...

Page 26: ...16 1 Refer to 99 Minimum Design Temperature table provided in the current edition of the ASHRAE Fundamentals Handbook 2 Poly Propylene vent pipe PP by Duravent and Centrotherm 3 Vent length in table...

Page 27: ...ance under veranda porch deck or balcony 12 Equal to or greater than soffit depth 3 feet 9m 12 3 feet 9m within a height 15 feet 4 5m above the meter regulator assembly 3 feet 9m 6 inches 152mm for ap...

Page 28: ...152mm for appliances 10 000 pliances 10 000 Btuh 3kw and 50 000 pliances 50 000 Btuh 15kw 6 inches 152mm for appliances 10 000 Btuh 3kw 12 inches 305mm for appliances 10 000 Btuh 3kw and 100 000 Btuh...

Page 29: ...e Figure 38 2 Intake and exhaust pipes should be placed as close together as possible at termination end refer to illustrations Minimum separation is 3 76 mm on roof terminations and 6 152 mm on sidew...

Page 30: ...ance above grade or average snow accumulation B Horizontal separation between intake and exhaust C Minimum from end of exhaust to inlet of intake D Exhaust pipe length E Wall support distance from top...

Page 31: ...46 US 44W92 or 44W93 Canada Minimum Above Average Snow Accumulation SHEET METAL STRAP Clamp and sheet metal strap must be field installed to support the weight of the termination kit FLASHING Not Furn...

Page 32: ...irect Vent Field Supplied Wall Termination SIZE TERMINATION PER EXHAUST PIPE TERMINATION SIZE REDUCTION TABLE FIELD PROVIDED REDUCER MAY BE REQUIRED TO ADAPT DIFFERENT VENT PIPE SIZE TO TERMINATION 3...

Page 33: ...ermination Drain Trap assembled Figure 49 Kit 51W18 USA 15Z70 Canada Parts Identification and Assembly Exhaust from Furnace To Termination Exhaust from Furnace To Termination Kit 51W18 is shown Figure...

Page 34: ...nd Figure 56 show the furnace and evaporator coil using a separate drain If necessary the condensate line from the furnace and evaporator coil can drain together See Figure 57 and Figure 58 Upflow fur...

Page 35: ...ng from furnace must slope down a minimum of 1 4 per ft toward trap Figure 54 Condensate Trap with Optional Overflow Switch When combining the furnace and evaporator coil drains together the A C conde...

Page 36: ...e must slope down a minimum of 1 4 per ft toward trap Figure 56 Unit with Cooling Coil Using Separate Drain Figure 57 Evaporator Coil Using a Common Drain Figure 58 Evaporator Coil Using a Common Drai...

Page 37: ...507768 04P Page 37 of 56 Issue 1933 Figure 59 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC...

Page 38: ...ing suitable hangers or straps Install a drip leg in vertical pipe runs to serve as a trap for sediment or condensate 5 A 1 8 N P T plugged tap or pressure post is located on the gas valve to facilita...

Page 39: ...507768 04P Page 39 of 56 Issue 1933 Figure 61 Gas Piping Upflow Applications Figure 62 Gas Piping Horizontal Applications...

Page 40: ...16 42 530 15 01 490 13 87 460 13 03 430 12 18 400 11 33 1 1 2 38 1 1 610 40 894 2100 59 46 460 41 34 1180 33 41 990 28 03 900 25 48 810 22 94 750 21 24 690 19 54 650 18 41 620 17 56 2 50 8 2 067 52 5...

Page 41: ...at check to make sure the wires will be long enough for servicing at a later date Make sure that thermostat wire is long enough to facilitate future removal of blower for service Complete the wiring c...

Page 42: ...no cooling or heating demand See Table 14 for allowable continuous circulation speeds 2 When the furnace is running in the heating mode the indoor blower will run on the heating speed 3 When there is...

Page 43: ...507768 04P Page 43 of 56 Issue 1933 045B3 070B3 090C4 110C5 Figure 67 Typical Wiring Diagram...

Page 44: ...r gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor The gas valve on the unit is equipped with a gas control switch lever Use only your hand to m...

Page 45: ...supplier s instructions If you do not smell gas go to next step 8 Move gas valve switch to ON See Figure 69 9 Replace the upper access panel 10 Turn on all electrical power to the unit 11 Set the the...

Page 46: ...n result in permanent damage to gas valve or overfire On multiple unit installations each unit should be checked separately with and without other units operating Supply pressure must fall within rang...

Page 47: ...ry set and require no adjustment Table 12 Burner Orifice Conversion Kits at Varying Altitudes Capacity 0 7 500 ft 0 2 286m 7 501 10 000 ft 2 286 3 048 m Natural to LP Propane LP Propane to Natural Hig...

Page 48: ...d and other spaces of the building 4 Close fireplace dampers 5 Turn on clothes dryers and any appliances not connected to the venting system Turn on any exhaust fans such as range hoods and bathroom e...

Page 49: ...at Anticipation Set the heat anticipator setting if adjustable according to the amp draw listed on the wiring diagram that is attached to the unit Electrical 1 Check all wiring for loose connections 2...

Page 50: ...75 0 10 1445 335 1275 230 1170 180 905 94 860 80 0 20 1415 345 1240 240 1125 190 870 101 800 85 0 30 1380 355 1205 250 1090 200 830 109 760 95 0 40 1345 370 1175 265 1055 210 790 117 710 105 0 50 131...

Page 51: ...2110 720 1850 495 1680 380 1560 320 1350 230 2085 745 1825 510 1655 390 1535 325 1335 230 0 40 2080 735 1810 520 1650 405 1515 330 1310 245 2060 760 1795 530 1625 405 1495 340 1295 245 0 50 2045 755...

Page 52: ...to empty condensate water 3 Remove the clean out cap from the condensate trap and empty water Inspect the trap then reinstall the clean out cap Cleaning Heat Exchanger If cleaning the heat exchanger...

Page 53: ...the 2 pin plug to the wire harness 38 Reconnect drain tubes between flue collar and cold end header box 39 Secure burner assembly to vestibule panel using four existing screws Burners are self alignin...

Page 54: ...vide a seal between the return air and the room where the furnace is installed Return air duct Must be properly attached and provide an air seal to the unit Operating performance Unit must be observed...

Page 55: ...t burner operation 1 Flash Reverse line voltage polarity 2 Flashes Improper earth ground 3 Flashes Burner failed to light or lost flame during heat demand 4 Flashes Low flame signal check flame sensor...

Page 56: ...height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than...

Reviews: