507716-01
Page 6 of 58
Issue 1717
•
The return air duct must be provided and sealed to the
furnace.
•
Return air temperature range between 60°F (16°C)
and 80°F (27°C) must be maintained.
•
Air filters must be installed in the system and must be
maintained during construction.
•
Air filters must be replaced upon construction
completion.
•
The input rate and temperature rise must be set per
the furnace rating plate.
•
One hundred percent (100%) outdoor air must be
provided for combustion air requirements during
construction. Temporary ducting may supply outdoor
air to the furnace. Do not connect duct directly to
the furnace. Size the temporary duct following the
instructions in section for Combustion, Dilution and
Ventilation Air in a confined space with air from outside.
•
The furnace heat exchanger, components, duct system,
air filters and evaporator coils must be thoroughly
cleaned following final construction cleanup.
•
All furnace operating conditions (including ignition,
input rate, temperature rise and venting) must be
verified according to these installation instructions.
General
These instructions are intended as a general guide and do
not supersede local codes in any way. Consult authorities
having jurisdiction before installation.
In addition to the requirements outlined previously, the
following general recommendations must be considered
when installing one of these furnaces:
•
Place the furnace as close to the center of the air
distribution system as possible. The furnace should
also be located close to the vent termination point.
•
When the furnace is installed in non-direct vent
applications, do not install the furnace where drafts
might blow directly into it. This could cause improper
combustion and unsafe operation.
•
When the furnace is installed in non-direct vent
applications, do not block the furnace combustion air
opening with clothing, boxes, doors, etc. Air is needed
for proper combustion and safe unit operation.
•
When the furnace is installed in an attic or other
insulated space, keep insulation away from the
furnace.
•
When the furnace is installed in an unconditioned
space, consider provisions required to prevent freezing
of condensate drain system.
NOTE:
The Commonwealth of Massachusetts stipulates
these additional requirements:
•
Gas furnaces shall be installed by a licensed plumber
or fitter only.
•
The gas cock must be “T handle” type.
•
When a furnace is installed in an attic, the passageway
to and service area surrounding the equipment shall
be floored.
These units should not be installed in areas normally
subject to freezing temperatures.
CAUTION
This product contains a chemical known to the State
of California to cause cancer, birth defects or other
reproductive harm.
WARNING
Combustion, Dilution & Ventilation Air
If this unit is installed as a Non-Direct Vent Furnace, follow
the guidelines in this section.
NOTE:
In Non-Direct Vent Installations, combustion air is
taken from indoors and flue gases are discharged outdoors.
Insufficient combustion air can cause headaches,
nausea, dizziness or asphyxiation. It will also cause
excess water in the heat exchanger resulting in rusting
and premature heat exchanger failure. Excessive
exposure to contaminated combustion air will result
in safety and performance related problems. Avoid
exposure to the following substances in the combustion
air supply:
•
Permanent wave solutions
•
Chlorinated waxes and cleaners
•
Chlorine base swimming pool chemicals
•
Water softening chemicals
•
De-icing salts or chemicals
•
Carbon tetrachloride
•
Halogen type refrigerants
•
Cleaning solvents (such as perchloroethylene)
•
Printing inks, paint removers, varnishes, etc.
•
Hydrochloric acid
•
Cements and glues
•
Antistatic fabric softeners for clothes dryers
•
Masonry acid washing materials
WARNING
Summary of Contents for GUH95C
Page 3: ...507716 01 Page 3 of 58 Issue 1717 Figure 1 Parts Arrangement...
Page 22: ...507716 01 Page 22 of 58 Issue 1717 Figure 25 Figure 26...
Page 37: ...507716 01 Page 37 of 58 Issue 1717 Figure 59 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC...
Page 56: ...507716 01 Page 56 of 58 Issue 1717 Start Up Performance Checklist...