507716-01
Page 42 of 58
Issue 1717
use an external relay. See Figure 68 for control board
configuration. This terminal is energized in the heating
mode when the combustion air inducer is operating.
Figure 65.
One 24V “H” 1/4” spade terminal is provided on the furnace
control board. Any humidifier rated up to 0.5 amp can be
connected to this terminal with the ground leg of the circuit
connected to ground or the “C” terminal. See Figure 68
for control board configuration. This terminal is energized
in the heating mode when the combustion air inducer is
operating.
Install the room thermostat according to the instructions
provided with the thermostat. See Figure 65 for thermostat
designations. If the furnace is being matched with a
heat pump, refer to the FM21 installation instruction or
appropriate dual fuel thermostat instructions.
Indoor Blower Speeds
1. When the thermostat is set to “FAN ON”, the indoor
blower will run continuously on the fan speed when
there is no cooling or heating demand.
2. When the furnace is running in the heating mode, the
indoor blower will run on the heating speed.
3. When there is a cooling demand, the indoor blower will
run on the cooling speed.
Generator Use - Voltage Requirements
•
The furnace requires 120 volts ± 10% (Range: 108
volts to 132 volts)
•
The furnace operates at 60 Hz ± 5% (Range: 57 Hz
to 63 Hz)
•
The furnace integrated control requires both proper
polarity and proper ground. Both polarity and proper
grounding should be checked before attempting to
operate the furnace on either permanent or temporary
power.
•
Generator should have a wave form distortion of less
than 5% THD (total harmonic distortion).
Figure 66. Typical Field Wiring Diagram
Summary of Contents for GUH95C
Page 3: ...507716 01 Page 3 of 58 Issue 1717 Figure 1 Parts Arrangement...
Page 22: ...507716 01 Page 22 of 58 Issue 1717 Figure 25 Figure 26...
Page 37: ...507716 01 Page 37 of 58 Issue 1717 Figure 59 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC...
Page 56: ...507716 01 Page 56 of 58 Issue 1717 Start Up Performance Checklist...