![Comfee CVP30W6AST User Manual Download Page 7](http://html1.mh-extra.com/html/comfee/cvp30w6ast/cvp30w6ast_user-manual_2640918007.webp)
INSTALLATION
WALL DRILLING AND BRACKET FIXING
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
A horizontal line
A
at
A horizontal line
B
at a
X
A horizontal line
C
at a
A
.
Mark a point (1) on the horizontal line
A
,
to the vertical reference line.
Repeat this operation on the other side and on the vertical reference line , checking that
the three marks are leveled.
Mark a point (2) on the horizontal line
B
,
to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
Mark a point (3) on the horizontal line
C
,
to the vertical reference line.
Repeat this operation on the other side , checking that the two marks are leveled.
above the cooker top.
inch above the horizontal line
1.
57"
(2)
B
A
(1)
C (3)
Vertical reference line
X
below the horizontal line
A.
7
Option Chimney
X
1
15.75" + 0
/
2
15.75" + 11.81"
15.35" - 24.41"
3
15.75" + 15.35"
15.35" - 27.95"
36.22" - 40.16"
7.48"
1.57"
3.15" 3.15"
6.69"
6.69"
7.48"
36.22" - 40.16"
3.15"
1.57"
6.69"