USER MANUAL FOR RA-7100
RA-7100 II2 QI
Copyright - refer to title page
Page 21
ENU Status : 1-0-0
Manual Handling
During transportation and installation, take necessary handling precautions to avoid potential physical
injury to the installation personnel and the equipment.
3.2.1 REPEATER INSTALLATION CHECKLIST
z
Working space available for installation and maintenance for each mounting arrangement. Ensure
unrestricted airflow.
z
Ensure earthing point is within reach of the ground wire.
z
Ensure a power source is within reach of the power cord and the power source has sufficient
capacity.
z
Where appropriate, ensure unused RF connectors are terminated.
z
Where appropriate, ensure unused optical fiber connectors are protected.
z
Do not locate the equipment near large transformers or motors that may cause electromagnetic
interference.
z
Reduce signal loss in feeder cable by minimizing the length and number of RF connections.
z
Ensure the equipment will be operated within the stated environment (refer to datasheet).
z
Where needed, couple BTS RF signal with a coupler to prevent damaging the equipment.
z
Where appropriate, confirm available of suitably terminated grade of RF and optical fiber.
z
Observe handling of all cables to prevent damage.