9
ABRI 820254 - 05/19 - ind. A
5. Installation
5.1.
Preparing the wall/supporting structure
You can use the filter head bracket to mark the mounting points. Use a spirit level to ensure the position is correct.
Then drill out the Ø of screws or wall plugs, depending on the mounting bracket. Now insert the 2 top screws.
5.2.
Preparing for connection
STOP
OK
+
50 cm
27,5 cm
9 cm
•
•
•
•
•
LR6 - AA
LR6 - AA
•
•
•
•
•
BIP - BIP
1 2 3
1
2
3
1
2
3
1 2 3
1 2 3
2
3
1
OK
--
+
--
1 2 3
Prepare to fit the stop valve on the connector using PTFE tape (Teflon).
Add between 15 and 20 layers of Teflon to the stop valve’s male thread to create a seal. Screw it onto the connector.
Be careful not to apply too much tightening force as this could break the stop valve. This breakage,
or the damage caused, will not be covered by the warranty.
Then connect one end of the pipe to the stop valve. Tighten this connection using the wrench.
Apply food grade grease, using the tube provided, to the stop valve’s inlet to make it easier to insert.
STOP
OK
+
50 cm
27,5 cm
9 cm
•
•
•
•
•
LR6 - AA
LR6 - AA
•
•
•
•
•
BIP - BIP
1 2 3
1
2
3
1
2
3
1 2 3
1 2 3
2
3
1
OK
--
+
--
1 2 3
STOP
OK
+
50 cm
27,5 cm
9 cm
•
•
•
•
•
LR6 - AA
LR6 - AA
•
•
•
•
•
BIP - BIP
1 2 3
1
2
3
1
2
3
1 2 3
1 2 3
2
3
1
OK
--
+
--
1 2 3
STOP
OK
+
50 cm
27,5 cm
9 cm
•
•
•
•
•
LR6 - AA
LR6 - AA
•
•
•
•
•
BIP - BIP
1 2 3
1
2
3
1
2
3
1 2 3
1 2 3
2
3
1
OK
--
+
--
1 2 3
STOP
OK
+
50 cm
27,5 cm
9 cm
•
•
•
•
•
LR6 - AA
LR6 - AA
•
•
•
•
•
BIP - BIP
1 2 3
1
2
3
1
2
3
1 2 3
1 2 3
2
3
1
OK
--
+
--
1 2 3