Page 36 of 39
INSTRUCTION MANUAL
SECT IO N 7
-
PERFORMING TESTING
Rev050321
Examples of typical test setups for
METHOD A
and
METHOD B
are shown in Figure 19
Test setups for devices having multiple I/O ports are more complex, and usually
require multiple CDNs of different types. Refer to the IEC 61000-4-6 standard for
guidance.
Only one CDN in the setup should be terminated with 50
Ω
. The remaining CDNs in
the setup are employed as decoupling networks, by leaving their RF ports open.
Distributed by: Reliant EMC LLC, +1 408 916
‐
5750, [email protected], www.reliantemc.com