3 - VENTILATION & COMBUSTION AIR

Provide combustion air and ventilation air in accordance 

with the section “Air for Combustion and Ventilation,” 

of the National Fuel Gas Code, ANSI Z223.1/NFPA 54 or 

applicable provisions of local building codes.

Provide make-up air where exhaust fans, clothes dryers, 

and kitchen ventilation equipment interfere with proper 

operation.

National Fuel Gas Code recognizes several methods 

of obtaining adequate ventilation and combustion air.  

Requirements of the authority having jurisdiction may 

override these methods.

• Engineered Installations. Must be approved by 

authority having jurisdictions.

• Mechanical Air Supply.  Provide minimum of 0.35 

cfm per Mbh for all appliances located within space.  

Additional requirements where exhaust fans installed.  

Interlock each appliance to mechanical air supply 

system to prevent main burner operation when 

mechanical air supply system not operating.

• All Indoor Air.  Calculate minimum volume for all 

appliances in space.  Use a different method if 

minimum volume not available.

 

о

Standard Method. Cannot be used if known air 

in

fi

 ltration rate is less than 0.40 air changes per 

hour.  See Table 3 for space with boiler only.  Use 

equation for multiple appliances.
Volume 

 50 ft

3

 x Total Input [Mbh]

 

о

Known Air In

fi

 ltration Rate.  See Table 3 for 

space with boiler only.  Use equation for multiple 

appliances.  Do not use an air in

fi

 ltration rate 

(ACH) greater than 0.60.
Volume 

 21 ft

3

/ACH x Total Input [Mbh]

 

о

Refer to National Fuel Gas Code for opening 

requirements between connection indoor spaces.

• All Outdoor Air.  Provide permanent opening(s) 

communicating directly or by ducts with outdoors.

 

о

Two Permanent Opening Method.  Provide opening 

commencing within 12 inches of top and second 

opening commencing within 12 inches of bottom 

enclosure.

 

Direct communication with outdoors or 

communicating through vertical ducts.  Provide 

minimum free area of 1 in

2

 per 4 Mbh of total 

input rating of all appliances in enclosure.

 

Communicating through horizontal ducts.  

Provide minimum free area of 1 in

2

 per 2 

Mbh of total input rating of all appliances in 

enclosure.

 

о

One Permanent Opening Method.  Provide opening 

commencing within 12 inches of top of enclosure.  

Provide minimum clearance of 1 inch on sides 

and back and 6 inches on front of boiler (does not 

supersede clearance to combustible materials).

•  Refer to National Fuel Gas Code for additional 

requirements for louvers, grilles, screens and air 

ducts.

• Combination Indoor and Outdoor Air.  Refer to 

National Fuel Gas Code for application information.

Table 3 - Space With Boiler Only

 

 Room Cubic Feet Volume

Input Mbh

Standard 

Method

Known Air Infi ltration Rate Method (ACH - Air Changes Per Hour)

0.1

0.2

0.3

0.4

0.5

0.6

50

2500

10500

5250

3500

2625

2100

1750

75

3750

15750

7875

5250

3938

3150

2625

100

5000

21000

10500

7000

5250

4200

3500

125

6250

26250

13125

8750

6563

5250

4375

150

7500

31500

15750

10500

7875

6300

5250

170

8500

35700

17850

11900

8925

7140

5950

200

10000

42000

21000

14000

10500

8400

7000

Summary of Contents for MCB-100J

Page 1: ...ALLATION OPERATION MAINTENANCE MANUAL Models MCB 50J MCB 75J MCB 100J MCB 125J MCB 150J MCB 170J MCB 200J Tested For 100 psi ASME Working Pressure C S A Certified For Natural Gas Or Propane Manufactur...

Page 2: ...ns Pump size Supply Return Tappings A B C D E F 50 11 5 4 30 36 5 1 75 15 7 5 30 37 5 1 100 15 7 6 30 37 6 1 125 18 9 6 30 37 6 1 150 18 9 7 30 37 6 1 170 22 11 7 30 38 6 1 200 22 11 8 30 38 7 1 Propa...

Page 3: ...tory equipped supplied or specified components may result in personal injury or loss of life TO THE OWNER Installation and service of this boiler must be performed by a qualified installer TO THE INST...

Page 4: ...nput rate 4 for every 1000 ft 304m above sea level 2 Net AHRI Water Ratings shown based on piping and pickup allowance of 1 15 Consult manufacturer before selecting boiler for installations having unu...

Page 5: ...practical 7 Allow 24 inches 610mm at front and right side for servicing and cleaning 8 When installed in utility room door should be wide enough to allow largest boiler part to enter or to permit rep...

Page 6: ...H greater than 0 60 Volume 21 ft3 ACH x Total Input Mbh Refer to National Fuel Gas Code for opening requirements between connection indoor spaces All Outdoor Air Provide permanent opening s communicat...

Page 7: ...of the relief valve outlet over the entire length of discharge line have no intervening shutoff valve between safety relief valve and discharge to atmosphere do not plug or place any obstruction in di...

Page 8: ...on 5 Hot water boilers and system must be filled with water and maintained to minimum pressure of 12 psi 6 Bypass piping is optional which gives ability to adjust supply boiler water temperature to fi...

Page 9: ...NING Burn and scald hazard Safety relief valve could discharge steam or hot water during operation Install discharge piping per these instructions 8 Install discharge piping from safety relief valve S...

Page 10: ...10 4 CONNECTING SUPPLY AND RETURN PIPING Figure 6 Single Zone System With DHW Figure 7 Multi Zone System With Circulators And DHW...

Page 11: ...11 4 CONNECTING SUPPLY AND RETURN PIPING Figure 8 Multi Zone System With Zone Valves And DHW With Circulator Figure 9 Multi Zone System With Zone Valves And DHW With Zone Valve...

Page 12: ...nting system 2 Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction leakage corrosion and other deficiencies which could cause an...

Page 13: ...ocation following installation 5 Thermostat s heat anticipator must be adjusted to match total current draw of all controls associated with boiler during heating cycle 7 VENT DAMPER INSTALLATION INSTR...

Page 14: ...ping Pressure test boiler and gas connection before placing boiler in operation Pressure test over 1 2 psig 3 5 kPa Disconnect boiler and its individual gas shutoff valve from gas supply system Pressu...

Page 15: ...at on outside wall 3 Do not install thermostat where it will be affected by drafts hot or cold pipes sunlight lighting fixtures televisions fireplace or chimney 4 Check thermostat operation by raising...

Page 16: ...M Figure 13 Integrated High Limit Electronic Ignition Control 240008781 WARNING Modification substitution or elimination of factory equipped supplied or specified components may result in personal inj...

Page 17: ...Appliance and call qualified service technician or your gas supplier TO TURN OFF GAS TO THE APPLIANCE 1 Set the thermostat to lowest setting 2 Turn off all electric power to the appliance if service i...

Page 18: ...if used to expel any air accumulated in the system Check entire piping system and if any leaks appear have them repaired Circulators need to be checked and maintained Refer to circulator manufacturer...

Page 19: ...pilot flame Be sure to replace cover screw after adjustment to prevent possible gas leakage See Figure 16 Page 19 Check burners and pilot for signs of corrosion rust or scale buildup Area around boil...

Page 20: ...water column from specified pressure listed on boiler rating plate Primary air adjustment is not necessary therefore air shutters are not furnished as standard equipment CHECK SAFETY CONTROL CIRCUIT T...

Page 21: ...lified service agency prior to resuming operation 4 ECONOMY Active Indicates thermal targeting function is active and limit control is reducing boiler temperature to conserve fuel Economy feature is a...

Page 22: ...NOTES...

Page 23: ...Date Service Performed Company Name Tech Initials Company Address Phone...

Page 24: ...COLUMBIA BOILER COMPANY Main offices and factory Pittstown PA...

Reviews: