
16
Figure 10 - Typical Installation
Notes:
1.
Condensate tee/drain is only needed when horizontal vent lengths exceed 10 feet (3m).
2.
Insert vent pipe in boiler venter outlet (vent adapter), apply silicone completely around edge of outlet and tighten
clamp.
HORIZONTAL VENT INSTALLATION INSTRUCTIONS
Summary of Contents for CDVB-100
Page 15: ...15 HORIZONTAL VENT INSTALLATION INSTRUCTIONS Figure 9 Figure 7a Vent Cap Figure 7b Figure 8 ...
Page 22: ...22 HORIZONTAL VENT INSTALLATION INSTRUCTIONS Figure 16 Termination Clearances ...
Page 31: ...31 PILOT PILOT ELECTRICAL WIRING Figure 26 HOT WATER CONTROL AND INTERMITTENT IGNITION WIRING ...
Page 44: ...Columbia Company Main offices and factory Pottstown PA ...