If your lockers are mounting to a cement curb proceed to step 5. 

 
 
 
 
 
 
 
 
 
 
 
 

 
 

 

 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

4.1 

Locate the locker feet hardware.  (Fig 4.1) 

4.2 

Lay the locker on its back and open the door.   

4.3 

Install the leg screw through the predrilled holes in the bottom of the 

locker. (Fig 4.2) 

4.4 

Screw the locker adjustable leg onto the leg screw and tighten. (Fig 4.3) 

4.5 

Install the white screw caps on the locker leg screw. (Fig 4.4) 

4.6 

Adjust the locker leg to 4 1/16” from bottom of locker. 

4.   Locker Feet 

Figure 4.1 

Figure 4.2 

Figure 4.3 

Figure 4.4 

Summary of Contents for PolyLife

Page 1: ...s Cedar Shims Thank you for choosing Columbia Lockers from PSISC We appreciate your business At PSISC we strive to provide the industry s best lockers with comprehensive installation guides Report any...

Page 2: ...ng Started 3 1 Using the top view locker layout sheet mark on the walls the starting and ending point of each run of lockers fig 3 1 3 2 Establish the highest point of the floor or cement curb in the...

Page 3: ...2008 by PSiSC Figure 3 2 LOCKER HEIGHT REFERENCE LINE Figure 3 4 LOCKER HEIGHT REFERENCE LINE CEMENT CURB Figure 3 3 Figure 3 1...

Page 4: ...pen the door 4 3 Install the leg screw through the predrilled holes in the bottom of the locker Fig 4 2 4 4 Screw the locker adjustable leg onto the leg screw and tighten Fig 4 3 4 5 Install the white...

Page 5: ...er fillers 5 2 Install the filler strip brackets on the filler strips using the filler strip screws provided Fig 5 1 5 3 Assemble the corner fillers using 3 corner filler brackets Install 4 filler str...

Page 6: ...w to hold the lockers in place 6 7 Install the proper filler or corner filler to the first locker using the supplied 10 24 x screws Insert them into the top and bottom connecting holes predrilled in t...

Page 7: ...2008 by PSiSC Figure 6 3 Figure 6 5 Figure 6 4 Figure 6 2 Figure 6 6 Figure 6 1...

Page 8: ...f adhesive strip to install the channels along front edge of locker body 7 3 Attach the rectangular sloped top panels by drilling a 7 32 hole thru the sloped top and the aluminum sloped top bracket Us...

Page 9: ...2008 by PSiSC Figure 7 2...

Page 10: ...ole in the bottom of the locker as a pilot hole Fig 8 1 8 5 Insert a FA 930 screw into the toe kick from inside the locker and tighten Follow this procedure for each locker 8 6 For toe kick mounting t...

Page 11: ...gs for the numbering sequence to be followed 9 2 Clean the area on the handle where the id plate is to be attached Wipe the surface dry 9 3 Remove the adhesive cover strip on the back of the id plate...

Reviews: