COLENTA 37 NDT Dryer
09/2008 FR
Page
4
BEFORE INSTALLATION
Site preparation has to be completed before delivery and installation.
4.1 LOCATION
Required measurements can be taken from the processor specification sheet. For "through-the-wall", a
purpose built panel is required (optional accessory).
4.2 ELECTRICAL SUPPLY
All electrical connections must meet national safety requirements. Correct fuses and electrical requirement
can be taken from the processor specification sheet.
4.3 WATERSUPPLY
There is now fixed water supply required to operate the dryer, it is recommended to have a cold water
supply with 2.5 meters of hosing to facilitate easy cleaning of the racks and tanks
9
Main switch of
the NDT Dryer
Power cord
Fuses
Make sure the room where the Dryer is installed, is well
ventilated (7-10-times the volume of the room per hour) and
the unit itself is leveled correctly.