![Coleman 8330-752 Installation Instructions Manual Download Page 7](http://html.mh-extra.com/html/coleman/8330-752/8330-752_installation-instructions-manual_2635717007.webp)
7
Follow all local and NEC (National Electrical Code) for
proper sizing of wire AWG based on Overcurrent
Protection Device selected and the length of the wiring run
to the air conditioner.
12. SECURING THE UPPER UNIT TO THE ROOF
The supplied mounting frame is used to secure the upper unit
to the roof per the following steps (See Figure 1).
A.
Locate the upper unit mount gasket over the 14” to
15” square opening in the roof.
B.
Install the ceiling assembly mount frame using the
four bolts found with the ceiling assembly.
C.
Proper tension has been achieved for each bolt when
any portion of each gasket indicating tab has been
pulled down even with the roof (See Figure 1). The
upper unit has now been properly installed with
optimum gasket compression.
FIGURE 1
Representative of 47000, 48000 and 49000 Series Units
Summary of Contents for 8330-752
Page 10: ...10 FIGURE 5 ...
Page 13: ...13 FIGURE 9 FIGURE 10 Ş ...