Coleman 8330-752 Installation Instructions Manual Download Page 11

 

11

Zone 2 is wired in by jumpering from Sig 1, Sig 2, B- and R+ 
on Zone 1 box to Zone 2 box.  Zone 3 is wired in by 
jumpering from Sig 1, Sig 2, B- and R+ on Zone 2 box to 
Zone 3 box.  Zone 4 is wired in by jumpering from Sig 1, Sig 
2, B- and R+ on Zone 3 box to Zone 4 box (See Figure 5). 
 
Connect the roof unit 115 volt electrical conduit to the 
wirebox 9 pin receptacle and verify that the plugs are properly 
aligned and have snapped together securely. 
 
Position the control box over the screws and use the wing nuts 
to fasten the control box to the upper unit enclosure.  For 
47000 series units, refer to Figure 9 on page 13.  Note that the 
box is installed with the wiring exiting upwards. 
 
Insert the evaporator freeze sensor between evaporator fins 
near the bottom center of the evaporator and between the 
bottom two tubes (See Figure 2).  Insert straight in until 
contacting the staggered tube directly in back of the insertion 
point.  When contact has been made, elevate the exposed end 
of the sensor approximately 45 degrees, then continue 
insertion at a 45 degree angle until the sensor is completely 
embedded into the evaporator. 

Complying with the warnings listed below, connect the 115 
VAC supply wiring to its power source.  Be sure all power 
remains off until beginning checkout procedure. 
 

DANGER 

 

TO PREVENT THE POSSIBILITY OF 
SHOCK INJURY FROM APPLIANCE 
OPERATION: 
 
THE WHITE WIRE MUST BE 
CONNECTED TO NEUTRAL IN THE 
SERVICE BOX ENTRANCE AND THE 
MECHANICAL GROUND MUST BE 
CONNECTED TO A GROUNDING 
LUG IN THE SERVICE BOX OR THE 
MOTOR GENERATOR 
COMPARTMENT. 

 

15.  INSTALLING THE HEATER ASSEMBLY 

 

NOTE 

 

The optional Electric Heating Element is intended to take the 
chill out of the indoor air when the air is a few degrees too 
cool for comfort.  The Electric Heating Element is an effective 
“chill chaser”.  

It is not a substitute for a furnace. 

 

A. 

If adding the electric heater to 48000 and 49000 
series units, position the assembly in the upper unit 
return air opening as shown in Figure 6.  The heater 
bracket must be installed over the metal basepan 
extrusion and positioned between the basepan and the 
plastic drain pan (See Figure 7).  Tighten set screw to 
secure the assembly so as to prevent movement.  
47000 series units will mount as shown in Figure 10 
(see page 13) using wing nuts. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

FIGURE 6 

B. 

Insert the two-pin connector of the heater umbilical 

 

into the receptacle on the control box.  Insure that the 

 

connector snap-locks into position. 

 

TIE ALL WIRING TO INSURE NO CONTACT WITH 
THE HEATER OR ANY SHARP EDGES.  KEEP IN 
MIND THAT HIGH VELOCITY AIR WILL BE 
ENCOUNTERED IN THIS AREA. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

FIGURE 7 

 
 
 
 

Summary of Contents for 8330-752

Page 1: ...L BOX KIT 24 VAC COOL ONLY 9530A751 CONTROL BOX KIT 12 VDC HEAT PUMP 9430A751 ZONE CONTROL KIT 12 VDC COOL ONLY 9430A755 ZONE CONTROL KIT 12 VDC HEAT READY 9630A751 ZONE CONTROL KIT 12 VDC HEAT PUMP Airxcel Inc RV Products Division P O Box 4020 Wichita KS 67204 Coleman is a registered trademark of The Coleman Company Inc used under license Mach is a registered trademark 1976N350 9 14 PP ...

Page 2: ...stallation CAREFULLY FOLLOW ALL INSTRUCTIONS AND WARNINGS IN THIS BOOKLET TO AVOID DAMAGE TO THE EQUIPMENT PERSONAL INJURY OR FIRE NOTE The words Shall or Must indicate a requirement which is essential to satisfactory and safe product performance The words Should or May indicate a recommendation which is not essential and not required but which may be useful or helpful 2 GENERAL INFORMATION AND RE...

Page 3: ...nce the evaporator warms to 55 degrees F IMPORTANT The low temperature sensor is part of the ceiling plenum electrical circuit The probe must be inserted into the evaporator coil of the roof top unit by the installer when bolting the ceiling plenum to the roof top unit 3 PACKAGE CONTENTS The mounting kit package contains the following 1 Steel mount frame 2 Ceiling shroud assembly 3 Small parts pac...

Page 4: ...te ease of installation allowances must be made for routing the low voltage wiring into the front of the opening Standard Control Box Zone Control Box Plenum Terminal Designation Thermostat Wire Connection Function of Low Voltage Terminal Extending From Ceiling Plenum R Red Provides 12 VDC to upper unit control box Cool Shed 2 Terminals White Jumper Wire Removing jumper wire will allow system to b...

Page 5: ...strip marked FREEZE The heater assembly for the 47000 series is 47233 4551 The heater assembly for the 48000 and 49000 series is 9233 4551 Heat kits are purchased separately 3 9630A751 12 VDC Zone Controlled Heat Pump This kit consists of a control box assembly The evaporator freeze sensor is shipped in an envelope for installation by quick connects to terminal strip marked FREEZE Backup electric ...

Page 6: ...r heat load shed optional B See Figure 5 for wiring requirements for multiple zones 3 Airxcel Inc low voltage wiring specifications A All low voltage wiring should be no smaller than 18 gauge B Low voltage wiring must be routed into the front side of the ceiling plenum opening C Low voltage wiring should not be routed with high voltage wiring D If low voltage and high voltage wires must cross they...

Page 7: ...r the following steps See Figure 1 A Locate the upper unit mount gasket over the 14 to 15 square opening in the roof B Install the ceiling assembly mount frame using the four bolts found with the ceiling assembly C Proper tension has been achieved for each bolt when any portion of each gasket indicating tab has been pulled down even with the roof See Figure 1 The upper unit has now been properly i...

Page 8: ...8530 750 5 Connect the roof unit 115 volt electrical conduit to the wirebox 9 pin receptacle and verify that the plugs are properly aligned and have snapped together securely 6 Locate the two machine screws inside the evaporator cover of the upper unit Align the control box over the screws and use the wing nuts supplied with the control box to secure it to the upper unit enclosure See Figure 2 for...

Page 9: ...he strain relief found with the control box then through the 7 8 hole in the side of the box FIGURE 3 5 Wire nut the black field power conductor to the stripped black 12 gauge wire in the control box 6 Wire nut the white field power conductor to the stripped white 12 gauge wire in the control box 7 Wire nut the ground field power conductor to the stripped green ground wire in the control box 8 Ins...

Page 10: ...10 FIGURE 5 ...

Page 11: ...ly wiring to its power source Be sure all power remains off until beginning checkout procedure DANGER TO PREVENT THE POSSIBILITY OF SHOCK INJURY FROM APPLIANCE OPERATION THE WHITE WIRE MUST BE CONNECTED TO NEUTRAL IN THE SERVICE BOX ENTRANCE AND THE MECHANICAL GROUND MUST BE CONNECTED TO A GROUNDING LUG IN THE SERVICE BOX OR THE MOTOR GENERATOR COMPARTMENT 15 INSTALLING THE HEATER ASSEMBLY NOTE Th...

Page 12: ...ns D Pull fabric duct material through ceiling assembly discharge opening Peel the release liner from the adhesive strip around the discharge opening Press the fabric duct material firmly in place around opening Cut off excess fabric on inside of ceiling assembly chute with a box knife taking care not to tear the fabric beyond the adhesive strip E Make sure the non allergenic filters are properly ...

Page 13: ...13 FIGURE 9 FIGURE 10 Ş ...

Reviews: