8. Operating instructions. (Brewing with coffee)
TOWER
8.6. Start brewing .
1. Push button 1/1
for 5 litre.
2. Push button 1/2
for 2,5 litre.
Display shows:
When
”
Brewing
”
is ready.
The ”
Brewing
” indicator
lamp will lit.
3. STOP / PAUSE button
- Press button once for interval position.
- Press button twice to stop brewing.
To complete brewing in interval position
press ½ alt. 1/1.
TAPING HOT WATER
It is possible taking
hot water while brewing coffee.
NOTE!
On the brewer unit, a water tap is placed for
serving hot water.
You can as a maximum taping 2 pitchers (1.8litre)
of hot water, while brewing coffee on 1 serving station .
27
.
Summary of Contents for TOWER
Page 20: ...20 40 41 42 50 49 48 43 44 45 46 47 51 52 14 Sprängskiss Serveringsstation TOWER 53 ...
Page 38: ...14 Exploded View serving station TOWER 38 40 41 42 50 49 48 43 44 45 46 47 51 52 53 ...
Page 39: ...39 15 Elschema Electrical diagram 3 x 400VAC ground zero TOWER ...
Page 40: ...40 15 Elschema Electrical diagram 3 x 400VAC ground TOWER ...
Page 41: ...41 15 Elschema Electrical diagram 3 x 230V ground TOWER ...
Page 42: ...42 16 Måttskiss Dimension sketch Tower station TOWER ...
Page 43: ...43 16 Måttskiss Dimension sketch serving station TOWER ...
Page 44: ...44 17 Väggmontering bryggstation Wall mounting brew station TOWER ...