Public Address System
Administrator Guide
Code Blue
●
259 Hedcor Street
●
Holland, MI
●
4923 USA
●
800.205.7186
●
www.codeblue.com
Rev 12/2018
page 10 of 31
GU-153-G
4
Installation & System Setup
This section covers the following units:
CB 1 Series with Public Address, including the 360° PAS Retrofit Kit
CB 5-s with Public Address
CB 2-e with Public Address
WM-180°
4.1
CB 1 Series with Public Address, including 360° PAS
Retrofit Kit
The following models are covered in the installation instructions for CB 1 Series with Public
Address or the 360° PAS Retrofit Kit:
CB 1-e
CB 1-s
CB 1-d
4.1.1
Tools Required
Ladder
– to reach the top of the unit.
Security bit
– to secure the PAS top to the adapter ring.
6mm Allen wrench
– to secure the PAS adapter ring to the top of the unit.
3/8
” socket set - to mount the mounting plate containing the new toroid transformer.
4.1.2
Before You Begin
4.1.2.1 Remove 120V AC power from the unit.
4.1.3
Install Adapter Ring
4.1.3.1 Remove the existing dome top assembly. Disconnect the red/black and
yellow/yellow wiring harnesses connected to the beacon/strobe mounted in the dome top
assembly.
4.1.3.2 Place the adapter ring on top of the bollard and tighten the three Allen set
screws to hold in place (see