Code Blue
•
259 Hedcor Street
•
Holland, MI 49423 USA
•
800.205.7186
•
www.codeblue.com
GU-153-H
page 13 of 26
Public Address System
Administrator Guide
5.3 CB 2-e with Public Address Installation
5.3.1 Tools Required
• Security bit - to remove phone to access mounting holes.
• ½-inch concrete bit – to drill holes in wall for the mounting anchors for mount-
ing bolts.
• 9/16” socket set - to secure the housing to the wall with mounting bolts.
5.3.2 Installation Procedures
5.3.2.1 Electrical preparation: the unit may have supply wires run from either (a)
behind the unit through the wall, or (b) below the unit using an external
conduit through the bottom. Holes in the back and bottom have been
provided for this purpose (See
Figure 10
on Page 23).
5.3.2.2 Remove the top of the unit.
5.3.2.3 Mark the mounting holes. In order to comply with the Americans with
Disabilities Act (ADA), the speakerphone button(s) should be posi-
tioned between 34 and 48 inches from grade level. Consult an ADA
specialist in your area to verify local and federal guidelines.
5.3.2.4 Drill all marked holes.
5.3.2.5 Install the housing. Four anchors of appropriate size and type should be
used to fasten the housing to the wall (see
Figure 3
on Page 14).
IMPORTANT: If wiring is being supplied from the back, ensure that the
conduit is aligned at this time.
5.3.2.6 Reattach the top.
5.3.3 Electrical Wiring
5.3.3.1 Ground – The ground (green) wire should be stripped and fastened to
the supplied grounding lug.
5.3.3.2 24V AC supply – Using the proper crimping tool, attach a #8 fork to
each of the incoming power wires and fasten them to the terminal
screws labeled “Line” and “Neutral.”
5.3.3.3 120/240V AC supply – Using the proper crimping tool, attach a #8 fork
to each of the incoming power wires and fasten them to the correct ter-
minals as labeled on the transformer. After completing the wire connec-
tions, install the supplied terminal covers (see
Figure 10
on Page 23).