Ku-Band BUC systems
12-50176-EN Issue 2, December 2010
Page 3 of 18
Figure 1:
Installation flow chart
Install BUC system
as per mounting instructions.
Earth the equipment.
Seal all cable connections.
Align the antenna to the main lobe of the satellite and
set the polarisation angle in accordance with
manufacturer’s instructions and satellite provider.
Tighten all fasteners and brackets.
Secure cables with cable ties.
Seal all access doors and covers.
Check that the power is on, and the equipment is
transmitting traffic.
Install antenna as per manufacturer’s instructions.
Install power to the site.
Install any other mounting structures.
Connect the equipment together
using appropriate cables.
Set up the indoor and outdoor equipment
to station parameters.
See
safeguarding personnel, protecting equipment,
and dissipating lightning
See instructions provided with mounting kits and
General guidelines for installing single-
See
Application Note: Setting up and operating
a BUC using serial command
s, 17-60118
See
Application Note: Installation information for
RF subsystems
, 17-60122
See
Application Note: Sealing N-type and MS
connectors in satellite equipment installations
,
17-60094 (provided in
See
See
Summary of Contents for 4908-MINIBUC
Page 19: ...15 42072 001 sheet 1...
Page 20: ...15 42072 001 sheet 2...
Page 21: ...15 42098 001...
Page 22: ...15 40128 001...
Page 23: ...15 40147 001...
Page 24: ...01 01192 CODAN...
Page 25: ...01 01828...
Page 26: ...01 01302...
Page 27: ...01 01689...
Page 28: ...01 01785...