Site preparation
98-133966-G1
Chapter 3: Installation
3-3
3333
Installation
3.2
Site preparation
The following topics have to be considered when installing the ADU:
•
•
•
Blocking zones — azimuth and elevation
•
Safe access to the ADU: Radiation hazard
•
Ship motion and offset from the ship’s motion centre
•
ADU mast design: Foundation and height
•
•
3.2.1
General site considerations
For optimum system performance, some guidelines on where to install
or mount the different components of the SAILOR 900 VSAT System
must be followed.
It is recommended to mount the ADU in a location with as much
360°
free line of sight to the satellite
as possible while making sure that
the support structure fulfills the requirements for the mast foundation.
The ADU must be mounted on stiffened structures with a minimum of
exposure to vibrations.
SAILOR900TM.book Page 3 Monday, September 16, 2013 11:01 AM
Summary of Contents for Sailor 900 VSAT
Page 2: ...98 138976 A Cover_SAILOR 900 VSAT System_407090B indd 2 15 04 2013 15 54 39 ...
Page 28: ...List of tables xxvi 98 133966 G1 SAILOR900TM book Page xxvi Monday September 16 2013 11 01 AM ...
Page 257: ...Appendices SAILOR900TM book Page 1 Monday September 16 2013 11 01 AM ...
Page 258: ...SAILOR900TM book Page 2 Monday September 16 2013 11 01 AM ...
Page 355: ...98 138976 A Cover_SAILOR 900 VSAT System_407090B indd 3 15 04 2013 15 54 40 ...