Page 8 of 8
www.cobhamsatcom.com
Field replacement procedure –
Doc. No.: 97-177616-A
28.
Close the hatch.
29.
Apply copper grease to thread of the 8 screws.
Grease type:
Rocol 250, Nulon 90, or Abcon
790.
30.
After closing the hatch, make sure to mount all
eight screws before tightening. This is to avoid
that the last screws will misalign.
Do not use a power tool!
31.
Tighten the eight screws. 6 Nm
Verify the initialization of the SAILOR XTR ADU:
After replacing the defective component re-initialize the pedestal and verify its operation.
1.
Switch on the BDU.
2.
Power up the VSAT modem.
3.
Perform an Extended POST. Verify that it is completed without any errors or warnings.
4.
Verify that the system is online and fully functional.