background image

Page  5 of 6

ITEM:900374N

ASSEMBLY INSTRUCTION

www.coastercompany.com

STEP 3
Insert one Wood Dowel (3) into each of the
pre-drilled holes in the top edges of the 
Assembly from step 2. Locate Center Shelf  (F) 
and lay fi nished side up on top of completed 
assembly. From the inside, attach Center Shelf 
(F) using Bolts (1) and Washers (2) through the 
pre-drilled holes in the mounting blocks.
Attach the Knob (4) to the Right Side Cabinet  
(C), use the bolts attached through the 
pre-drilled holes in the Right Side Cabinet (C) as 
diagram. Then use a Phillips Head Screwdriver 
to tighten the bolts.  
Repeat with Left Side Cabinet (B)

STEP 5
Insert one Wood Dowel (3) into each of the
pre-drilled holes in the top edges of the 
Assembly from step 4. Locate Mantel/Top (E) 
and lay fi nished side up on top of completed 
assembly. From the inside, attach Mantel/Top (E) 
using Bolts (1) and Washers (2) through the 
pre-drilled holes in the mounting blocks.
Using Phillips head screwdriver, tighten all 
Bolts alternating top and bottom, left and right.

STEP 6
Rest Center Back Panel (I) into groove on 
Mantel Top (E) back edge. Allow the 
pre-installed magnets to keep the Center Back 
Panel (I) in closed position.

STEP 4
Insert one Wood Dowel (3) into each of the    
pre-drilled holes.
Locate the upper side panels (G, H) on the top of 
the assembly from step 3, as shown in diagram. 
Make sure that dowels are seated into the 
pre-drilled holes. Using Bolt (1) and Washer (2) 
attach these panels through pre-drilled holes in the 
mounting blocks 
HAND TIGHTEN ONLY.      

1

2

3

3

F

H

G

4

3

1
2

3

E

I

3

3

1

2

Reviews: