3.1.2 Storage
To avoid damage or adverse effects, please store in the following conditions:

clean, dry and well ventilated environment

ambient temperature of -20

to 55

(-4

°

F to 131

°

F)

relative humidity of less than 90%, with no condensation

keep away from corrosive or flammable materials

energize every six months, to prevent the internal electrolytic capacitors from drying up

3.1.3 Handling

During the handling process, you should avoid any strong vibrations, bumps or falls. Please

pay attention to safety during handling. Be safe! Do not place the box upside down or sideways.
Keep track of accessories, manuals and warranty cards when taking the equipment out of the box.

3.2 Installation

Please check the box. If there is damage when out of the box or if the box has significant damage,
please contact the supplier immediately.
1) Make sure the front panel power switch is “OFF”
2) In accordance with the terminal block wiring terminals identified
3)

BAT

terminal for the battery

BAT

is positive

BAT

is negative

4)

PV

terminal for solar panel array

PV

is positive

PV

is negative

5)

AC OUT

is the output terminal

connect to appliances or circuit breaker panel

6)

AC IN”

is the grid input terminal

connect to grid power

Summary of Contents for Helios Series

Page 1: ......

Page 2: ...ecial attention to the recommendations relating to safety 1 Safety Summary 2 2 Product Introduction 2 2 1 Introduction 2 2 2 Technical Specifications 3 3 Operation and Installation 3 3 1 Operation 3 3 2 Installation 4 4 Precautions 6 5 Applications 7 5 1 Single Application 7 5 2 Parallel Application 9 5 3 Series Application 10 6 Display and Parameter setting guide 11 6 1 Display 16 6 2 Parameter S...

Page 3: ... until the capacitors discharge There is still high voltage inside the machine The ground terminal must be grounded Ground resistance less than 10 Ω Use thick diameter ground cable Keep the ground cable short and as close to the machine as possible Ground is can be parallel 2 Product Introduction 2 1 Introduction The Helios Series Inverter consists of a Pure Sine Wave Inverter MPPT Solar Charge Co...

Page 4: ...48V 72VDC PV Panel Max Input Power W 24V 1800W 48V 3600W varies by model MPPT Charging Current A 40A 60A varies by model Grid Charging Current A 15A 25A varies by model Dielectric Strength 1500VAC 5mA 1min Ambient Temperature 20 to 55 4 F to 131 F Humidity 90 RH Non condensing Altitude m 3000m 9800ft 3 Operation and Installation 3 1 Operation 3 1 1 Open Before delivery this equipment has been stri...

Page 5: ...y during handling Be safe Do not place the box upside down or sideways Keep track of accessories manuals and warranty cards when taking the equipment out of the box 3 2 Installation Please check the box If there is damage when out of the box or if the box has significant damage please contact the supplier immediately 1 Make sure the front panel power switch is OFF 2 In accordance with the terminal...

Page 6: ...s To be reliably connected together B USB interface is upgraded with extended functionality C RS485 as the see through communication for back stage applications when connected to the PC This is the standard MODBUS communication protocol Connect to your computer using the standard communication module D CAN port on all in one in parallel or in series for synchronous communication When applied in pa...

Page 7: ...total power load should not be more than the rated power of the inverter This could permanently damage the inverter If it is an inductive or capacitive load reduce power consumption to avoid exceeding the peak power of the inverter When connecting in parallel connect the L terminal from AC OUT together and connect N terminal from the AC OUT together as well There must not be a connection error Oth...

Page 8: ...ve to connect to the CAN R If would like to connect with PC program please using the standard USB cable softw are and drive can be download from website www cnbou com 5 Applications 5 1 Single Application 5 1 1 Operating Model Solar Priority Under this option the inverter output is the power supply When the battery voltage is low it will switch to the grid supply or the power will shut off if the ...

Page 9: ...tions see pages 4 and 5 2 After everything is connected correctly press the POWER button to turn on the inverter Grid Priority Under this option the grid output is the power supply The inverter output is now the back up power supply The AC Charger and MPPT Controller are now charging the batteries together Make sure your batteries are charged sufficiently before a power outage The AC Charger can b...

Page 10: ...WER button to turn on the inverter 5 2 Parallel Application The Helios Series Inverter can support up to 30 pcs in parallel with same series to enhance the power Internationally standardized CAN communication protocol is used for high speed synchronous communication Steps Note In parallel strictly follow the steps and regulatory requirements described below If not followed this may cause the inver...

Page 11: ... steps and regulatory requirements described below If not followed this may cause the inverter to stop working In severe cases the inverter could be permanently damaged Due to the inverter being damaged by a Non Standard Operation the warranty will become null and void 1 Connect all of the three inverter s CAN communication ports Then connect the N from the AC OUT together from all three inverters...

Page 12: ...n powering on the inverter for the first time it will enter the Settings Wizard Follow the instructions to set the parameters and connections When the settings are finished the Helios will check the all main parameters automatically and begin working All running status and information will begin recording Year Month ...

Page 13: ...12 Day Hour ...

Page 14: ...d on your region The Helios will record the generating capacity every day as well as the fault code information Output voltage The Helios Series Inverter output voltage can set between 100V 250V to meet the requirements for each region ...

Page 15: ...14 Temperature unit selection Select Fahrenheit or Celsius Grid Frequency Set it the same as the grid frequency for your region ...

Page 16: ...15 Priority Default Set Solar Priority or Grid Priority Output Application Single Parallel or 3 phase Series Output ...

Page 17: ...y are correct Check the wire connections again and press SET to start power 6 1 Display Helios Series Inverter uses a 4 3 inch TFT color screen as the monitor display Now you can visually monitor the current operating status of the different systems ...

Page 18: ...tc 6 2 Parameter Setting In the control interface holding down the and at same time about 5 seconds will bring you to the settings interface P 6 2 1 After entering click the arrow keys to move the cursor to the selection you want to view Click on the SET button to enter the setup To return to the monitor interface press the ESC button Setting interface includes Main Options Parameter Setting Versi...

Page 19: ...r status and fault codes P 6 2 3 Main Options includes Temperature Unit Setting Grid and Solar Priority setting Output Frequency setting Soft start setting Display Steady backlight setting Alarm Sound setting and Grid Charging disable setting ...

Page 20: ...19 P 6 2 4 Parameter Setting includes Language setting Time setting Output Voltage setting and Battery Type setting P 6 2 5 Versions Info includes version No of software hardware ...

Page 21: ...20 P 6 2 6 INV Fault Log includes operating status record of the inverter P 6 2 7 MPPT Fault Log includes operating status record of the MPPT Solar Charge Controller ...

Page 22: ...ulative record of Generating Capacity Can be record up to 2 year and then it will clear after a full year P 6 2 9 Control Set includes Alarm Cancel Fault Resetting Parallel Master Slave settings 3phase 380V output Master Slave B Slave C settings ...

Page 23: ...cursor to Series Set Master hold the choose Master and Slave Set and save This option includes A Master A Slave B Slave and C Slave A Master is the Master inverter The B Slave is the first Slave inverter In the series application please note the phase sequence When in Series Application the Slave Series Set option must set to B Slave and C Slave they cannot be set to the same Slave For clarificati...

Page 24: ...too large it needs to reduce the same time running machine or change a higher power model 6 3 4 Over AC Meaning Grid over voltge Reason The input of the grid voltage exceeds the device setting range Solution 1 The device rated voltage is not right reset 2 Input grid regulation difference exceeding the standard input installation of the regulator 6 3 5 Over H Meaning Module radiator temperature is ...

Page 25: ...nals of the device should not connect the offline without phase lock power such as dual power switch or unlock phase UPS otherwise phase will dangerous mutations caused by a short circuit 6 3 9 DCBUS H Meaning DC Bus over voltage Reason Bus voltage is too high Solution 1 There is a surge voltage input if the power supply have quality problems please add the input surge absorption equipment and fil...

Page 26: ...ected to the power supply Solution 1 The output wire was connected to the device with AC power output remove it 2 The failure is only produced by the power of the detection once the output is normal will no longer be detected can not be expected to be used to protect when the device is working 6 3 16 CHGR C Meaning Solar charging over current 1 Reason Solar charging battery current over current So...

Page 27: ...h temperature or signs of burning discoloration Tighten terminal screws to the recommended torque Check if there is dirt nesting insects or corrosion Clean up as required If the arrester has failed replace the failed arrester in a timely manner to prevent the controller or other devices from being damaged by lightning 7 2 Repairing Procedure Before calling a repair center read the user s manual to...

Page 28: ...27 ...

Reviews: